background image

4  |  nVent.com

5/8 in

(15 mm)

2 3/8 in

(60 mm)

8

10

12

13

Tubes

9

11

•  Using a pencil or pen, 

mark the jacket 5/8 in 
(15 mm) from the end of 

the core as shown.

•  Push core sealer onto the heating cable to the 

mark made in step 8.

•  Extra force may be required for larger cables or 

at lower temperatures.

•  It is OK if the tubes are pushed out while 

installing the core sealer.

•  Slip the green/yellow tube onto the braid. Heat-

shrinking is not required.

•  Re-twist and straighten bus wires,

 then insert 

into the tubes as shown.

•  Make sure all strands go into the tubes.

•  Remove the tubes and dispose of them 

in core sealer plastic bag.

•  Apply 3 wraps of glass tape 

(RAYCHEM GT-66 or GS-54)

.

Make sure the bus 

wires do not kink, 

bunch, or crossover.

Отзывы: