background image

nVent.com  |  3

1/4 in

(5 mm)

•  Notch core.
•  Peel bus wire from core.
•  Score core between bus wires at inner jacket.
•  Bend and snap core.
•  Peel core from bus wire.
•  Remove any remaining core material from bus wires.

6 1/2 in

(165 mm)

5

6

7

7

•  Lightly score inner jacket around and down as shown.
•  Peel off inner jacket.

•  Determine heating 

cable type and 
continue as shown.

•  Cut and remove all fiber strands.
•  Score and remove center spacer.
•  Remove any remaining core material from bus wires.

IMPORTANT: For LBTV2 heating cables omit Steps 6 
through 12. Instead refer to installation instructions 
supplied with the HCS-100-A kit, then go to step 13.

BTV-CR, BTV-CT and 

QTVR-CT heating cable

XTV-CT and KTV-CT 

heating cable

BTV and QTVR heating cable

XTV and KTV heating cable

Отзывы: