background image

Page 3

MODELS   QTXEN080FLT • QTXEN110FLT • QTXEN150FLT

4. Connect electrical wiring.

Run 120 VAC house wiring to installation location. Use
proper UL approved connector to secure house wiring to
wiring plate. Connect wires as shown in wiring diagrams.

CONNECT WIRING

2. Attach

damper/duct

connector.

Snap damper /
duct connector
onto housing.
Make sure
connector is flush
with top of
housing and
damper flap falls
closed.

3. Install

6-inch

round

ductwork.

Connect 6-inch
round ductwork
to damper / duct
connector. Run
ductwork to a
roof cap or wall
cap. Tape all
ductwork
connections to make them secure and air tight.

1b.Mount housing anywhere between

trusses, joists, or 

I

-joists using hanger

bars.

Sliding hanger bars are provided to allow for accurate posi-
tioning of housing anywhere between framing. They can be
used on all types of framing (

I

-joist, standard joist, and truss

construction) and span up to 24”.

Attach the MOUNTING CHANNELS to the housing using the
SCREWS supplied. Make sure TABS face “up” as shown. Use
the set of channel mounting holes (marked “STD”) to mount
the housing flush with the bottom of the drywall. Use the other
set of holes (not marked) to mount the housing flush with the
top of the drywall.

HANGER

BAR (4)

SCREWS (4)

TAB

Extend HANGER BARS to the width of the framing.

Hold ventilator in place with the hanger bar tabs wrapping
around the BOTTOM EDGE OF THE FRAMING.

NAIL ventilator to framing or fasten with screws (not provided)
through HOLES near nails.

*

 To ensure a noise-free mount: Secure hanger bars together

with SCREWS or use a pliers to crimp mounting channels
tightly around hanger bars.

*

SCREW (2)

HOLE FOR OPTIONAL

SCREW MOUNTING (4)

STD

MOUNTING

CHANNEL (2)

NAIL (4)

BOTTOM EDGE

OF FRAMING

Отзывы: