2
FIGURE 7
FIGURE 8
FIGURE 6
BLACK
WHITE
TOGGLE
SWITCH
WHITE
BLACK
BLACK
GROUND
SWITCH
BOX
HOUSING
120 VAC LINE IN
FIGURE 2
FIGURE 3
FIGURE 4
INSTALLATION
Refer to FIGURE 2
1. Nail mounting bracket to joist or stud. Use gauge on bracket to
locate it for 1/2” or 3/4” drywall.
Refer to FIGURE 3
2. Snap fan housing onto bracket.
Refer to FIGURE 4
3. Remove the knockout plate from fan. Break out either top or
rear electrical access hole. Insert a screwdriver into slot in knock-
out and bend back and forth to break tabs.
NOTE: Turn off power and lock out service panel before installing
electrical wiring.
Refer to FIGURE 5
4. Secure power cable to knockout plate with proper connector
for type of cable being used. Allow 6” of cable to extend beyond
knockout plate. Connect ground wire to green ground screw on
knockout plate.
Refer to FIGURE 6
5. Make electrical connections. Wire white to white and black to
black.
Refer to FIGURE 7
6. Carefully tuck wiring inside wiring compartment and reattach
knockout plate.
Refer to FIGURE 8
7. Attach grille. Squeeze grille springs and insert them into slots
in motor plate. Push grille against ceiling. Grille may be pa-
pered or painted.
USE AND CARE
CAUTION – DISCONNECT POWER AT SERVICE ENTRANCE
AND LOCK OUT PANEL BEFORE CLEANING OR SERVICING
UNIT.
Grille
Clean grille with mild soap or detergent and dry with a soft cloth.
Do not use abrasive cloth, steel wool pads, or scouring powders.
Filter
Charcoal filter is long-lasting. Each filter will last 60 to 90 days when
operated continuously, or longer depending on frequency of use.
Order replacement charcoal filter from list below.
Fan Assembly
To clean: Remove grille and filter. Gently vacuum impeller, motor
and interior of housing.
CAUTION – METAL AND ELECTRICAL PARTS SHOULD NEVER
BE IMMERSED IN WATER.
FIGURE 5
< < < < <
>>>>>