Operating Instruction and Documentation
Sprinter Mobil 3000
- 30 -
Choice of the dowel length with floor pavement or tile surface
Table to pic.
Liebig-dowels
Dowel
type BM10-15/70/65 BM10-15/0/100 BM10-15/70/140
Drilling
depth
(mm)
a
85
85
85
Min.
anchorage
depth
(mm)
b
70
70
70
Thickness of concrete (mm)
c min.140(*)
min.140(*)
min.140(*)
Diameter
of
bore
(mm)
d
15
15
15
Thickness of the lift-pieces (mm)
e 40-65
65-100
100-140
Number
of
dowels x
x
x
Starting torque (Nm) 40 Nm
40Nm
40Nm
(*) minimum thickness of concrete by using the mentioned dowels. Otherwise,
observe the regulation of the foundation plan.
You can use equivalent dowels from another dowel manufacturer (with license) but
observe their regulation.
Содержание Sprinter Mobil 3000
Страница 9: ...Operating Instruction and Documentation Sprinter Mobil 3000 9 2 5 Declaration of conformity...
Страница 11: ...Operating Instruction and Documentation Sprinter Mobil 3000 11 rear drive vehicle subject to alterations...
Страница 14: ...Operating Instruction and Documentation Sprinter Mobil 3000 14 3 2 Data sheet...
Страница 17: ...Operating Instruction and Documentation Sprinter Mobil 3000 17...
Страница 18: ...Operating Instruction and Documentation Sprinter Mobil 3000 18...
Страница 19: ...Operating Instruction and Documentation Sprinter Mobil 3000 19...
Страница 20: ...Operating Instruction and Documentation Sprinter Mobil 3000 20...