background image

2.

 Insert the positioning tool into the 

“top load” saddle and place them on 

the pipe, after completing scraping and 

cleaning operations (check installation 

instruction of the fitting).

Note for article 12EIPRESTL142402:

  Make 

sure that the cap is competely tightened 

until the stop.

3.

Pass the belt under the pipe and 

insert it into the tightening clamp from 

the bottom to the top, as showed on 

the figure.

Care not to move the fitting in order not 

to compromise the cleaning operation.

4.

Insert the belt up in the buttonhole  

and then  pull down to tighten the ‘top 

load’ saddle on the pipe.

Отзывы: