7
4)
ASSEMBLING THE NUCU AFTER CLEANING
You can assemble the Nucu after cleaning when all parts are dry.
Steps:
1)
Place the mattress inside the base section
2)
Slide the base plate under the mattress
3)
Place the padding in its place
4)
Close the base section’s and padding’s zippers carefully
5)
TECHNICAL SPECIFICATIONS
•
Recommended operating temperature -10°C
–
40°C
•
Protection against dust ingress and splash water. IP54
•
Nucu is designed and manufactured in Finland
6)
SUPPORT
•
•
www.nucu.fi/en/support
Содержание Syke
Страница 1: ...MANUAL ...