background image

6

N

L

N

L

N

L

N

L

Switch

240v     12v

Room light

Room light

Transformer

3

1

N

L

2

Switch

RS12  (using run on circuit). 

RS12 Unit ventilating one room.

RS12 Unit ventilating two rooms.

2RAS12  (no run on timer).

Fuse

2 Amp max

Fuse

2 Amp max

C

C

Installation and Maintenance  

OPUS 12V (R range)

Electrical Wiring  Diagrams

N

L

N

L

N

L

Switch

Room light

3

1

N

L

2

Fuse

2 Amp max

C

SL

N

L

SL

N

L

SL

N

L

SL

N

L

3

1

N

L

2

3

2

3

1

N

L

2

2RAS12  Unit ventilating one room
(using run on circuit).

N

L

Switch

Room light

Remote fail LED

Remote fail LED

3

1

N

L

2

Fuse

2 Amp max

C

RS12 Unit ventilating two rooms (using run on circuit).

2RAS12 Unit ventilating two rooms (using run on circuit).

2RAS12 Unit ventilating two rooms (no run on timer).

Wiring details for remote  indicator.

Fan terminal block

Remote 
indicator panel

N

L

Fuse

2 Amp max

Switches (double pole)

Room light

C

C

N

L

N

L

240v     12v

Transformer

3

1

N

L

2

SL

N

L

SL

N

L

3

1

N

L

2

N

L

Fuse

2 Amp max

Switches 

(double pole)

Room light

C

C

Remote fail LED

N

L

Fuse

2 Amp max

Switches

(double pole)

Room light

C

C

3

1

N

L

2

N

L

N

L

3

1

N

L

2

SL

N

L

SL

N

L

Remote fail LED

N

L

Fuse

2 Amp max

Switches 

(double pole)

Room light

C

C

Содержание OPUS 30 R Series

Страница 1: ...hrough filters located on the front cover of the unit and which can easily be removed for leaning Units can be fitted with a selection of controls which enable them to be linked to light switches either directly or through run on circuits Coding RS12 Single fan unit incorporating a run on circuit 2RAS12 Twin unit incorporating both run on and fan failure detection change over circuits Installation...

Страница 2: ... in position d Offer up the casing to the mounting frame feeding the supply cable through the entry hole Engage the outlet spigot s in the ductwork and fix the casing to the frame using the three screws supplied e Connect the wiring to the internal terminal block socket Fig 3 Selecting bracket length Fig 4 Mounting frame assembly f Fit the fan module to the case mating it s plug fully with the int...

Страница 3: ...92 22 5 Filters 255 98 O D 337 FIXING 230 ctrs 225 FIXING 158 ctrs VIEW ON REAR showing fixing points Dimensions Optional ancillaries Outlet Baffle Roof Cowl 50mm Subsidiary spigot Wall Cowl 50mm Inlet grille 160 230 230 146 165 dia 98 o d Birdguard 148 134 98 O D 32 125 125 13 5 15 110 fix ctrs 50 O D 4 x 3 7 dia fix holes 50 o d 30 7 ...

Страница 4: ...d assist in installation SPLASH ZONE The Splash Zone can be considered to be an area within a bathroom or shower room where a person using the bath or shower can effectively reach An arms reach is defined as 0 6 metres from the edge of the bath or shower up to a height of 2 25 metres Procedure 1 Remove two screws securing the cover and remove the cover 2 Position the base enclosure on mounting sur...

Страница 5: ...d Maintenance OPUS 12V R range 5 Installation Notes WIRING SIZES It is important to note that the size of wire used between the transformer and the fan unit can have an adverse effect on the units performance if the following table is not adherred to Mains supply 240v 0 5mm sq TRANSFORMER TO FAN Cable run max 10m Cable size Up to 2m 0 75mm sq Up to 4m 1 00mm sq Up to 6m 1 50mm sq Up to 10m 2 50mm ...

Страница 6: ...L Switch Room light Remote fail LED Remote fail LED 3 1 N L 2 Fuse 2 Amp max C RS12 Unit ventilating two rooms using run on circuit 2RAS12 Unit ventilating two rooms using run on circuit 2RAS12 Unit ventilating two rooms no run on timer Wiring details for remote indicator Fan terminal block Remote indicator panel N L Fuse 2 Amp max Switches double pole Room light C C N L N L 240v 12v Transformer 3...

Страница 7: ...Voltage Directive Applied Harmonised Standards E50081 1 EN50082 1 EN60204 1 EN60335 2 80 Basis of Self Attestation Quality Assurance to BS EN ISO 9001 BSI Registered Firm Certificate No FM 149 Signature of manufacture representatives Name Position Date 1 C Biggs Technical Director 3 3 00 2 W Glover Manufacturing Director 3 3 00 NuAire Limited Western Industrial Estate Caerphilly Mid Glamorgan CF83...

Страница 8: ...craper Wash the cover in warm soapy water Dry thoroughly Refit the fan module followed by the cover Test run Adjusting the run on timer Remove cover Locate the Time Delay Adjustment at the plastic box integral with the fan module Re set against the graduated scale Re fit the cover Warranty The plastic control box integral with the fan assembly is a sealed component Breaking the plastic sealing tie...

Отзывы: