24. 01. 17. Leaflet Number 671500

Installation and Maintenance

MRXBOX95B-LH1/LH2 Mechanical Ventilation with Heat Recovery & Summer Bypass

840

430

 VIEW FROM FRONT 3 X 125mm spigots

SIDE  VIEW (controls) with  1 X 125mm spigot

450

 VIEW FROM TOP

Condensate 

drain alternative

position

21.5mm dia.

condensate 

drain 

21.5mm dia.

condensate 

drain alternative

position

SIDE  VIEW (non controls)

3.0 Dimensions (mm) 

Figure 6.

Filter.

Filter and Bypass.

Adjustment potentiometers

and indication lights.

Bypass.

Lid.

Condensate Drain

outlet.

M20 & M16 Cable Glands.

Mains Entry & Blanking Gland.

Figure 5. Main unit components shown with front and lid removed.

Содержание MRXBOX95B-LH2

Страница 1: ...switch This opens the damper via a wax actuator When the switch signal is de activated the unit returns to its original state air through the heat exchanger Outside air supplied through the bypass is...

Страница 2: ...MVHR DRAIN outlet and slide the cap and rubber seal onto the pipe 4 Insert the pipe end fully into the socket 5 Slide the rubber seal and screwed cap up against the face of the socket and tighten the...

Страница 3: ...larly supply and extract air grilles should be at least 300mm apart Figure 4 Typical MVHR ducted arrangement for a loft mounted unit using the Nuaire condensation trap 125mm dia CONTRAP 125 Nuaire CON...

Страница 4: ...m spigot 450 VIEW FROM TOP Condensate drain alternative position 21 5mm dia condensate drain 21 5mm dia condensate drain alternative position SIDE VIEW non controls 3 0 Dimensions mm Figure 6 Filter F...

Страница 5: ...ce with current IEE wiring regulations See fuse rating MAINS 230V 50Hz Room light Light switch Double Pole N L 3 Pole isolator Kitchen switch Green yellow Blue Brown Black Summer bypass switch Grey on...

Страница 6: ...de of the unit to allow access for maintenance purposes 1 Replace filters every 5 years Remove the top cover and slide out the two G4 filters fitted either side of the heat exchanger Replace with new...

Страница 7: ...eing affected 3 2 When handling the equipment care should be taken with corners and edges and that the weight distribution within the unit is considered Lifting gear such as slings or ropes must be ar...

Страница 8: ...8 24 01 17 Leaflet Number 671500 Western Industrial Estate Caerphilly United Kingdom CF83 1NA T 029 2085 8400 F 029 2085 8444 E info nuaire co uk W www nuaire co uk...

Отзывы: