background image

1

20. 07. 20. Document Number  671802

Nuaire | 

Western Industrial Estate 

Caerphilly 

CF83 1NA 

|

 

nuaire.co.uk

MRXBOX-SIL2 (Silencer)
MRXBOX-FF2 (First Fix Plenum Chamber)

 

Acoustic Solution System For Wall / Cupboard Mounted  
MRXBOX(AB)-ECO3 Units

Installation and Maintenance

1.0 SAFETY INFORMATION

• 

Ducting must be securely fixed with screws to the spigot to prevent access to live parts. Duct 
runs terminating close to the fan must be adequately protected by suitable guards.

• 

This appliance should not be used by children or persons with reduced physical, sensory or 
mental capabilities or lack of experience and knowledge, unless they have been given supervision 
or instruction concerning the safe use of the appliance by a person responsible for their safety. 
Children shall not play with the appliance. Cleaning and user maintenance shall not be carried 
out by children.

1.1 Symbols

 

REFER TO INSTRUCTION MANUAL

 

 

 

Read and understand the installation and maintenance manual before installing,    

 

 

operating or maintaining this product.

1.2 Important Information

This manual contains important information on the safe and 
appropriate assembly, transport, commissioning, operation, 
maintenance, disassembly and simple troubleshooting of the product.

While the product has been manufactured according to the accepted 
rules of current technology, there is still a danger of personal injury or 
damage to equipment if the following general safety instructions and 
the warnings contained in these instructions are not complied with.

Read these instructions completely and thoroughly before 
working with the product.

Keep these instructions in a location where they are accessible 
to all users at all times.

Always include the operating instructions when you pass the 
product on to third parties.

1.3 Personal Protective Equipment

The following minimum Personal Protective Equipment (PPE) is 
recommended when interacting with Nuaire product:

Protective Steel Toed Shoes - 

when handling heavy objects.

 

Full Finger Gloves (Marigold PU800 or equivalent) - 

when 

handling sheet metal components. 

Semi Fingerless Gloves (Marigold PU3000 3DO or equivalent) 

- when conducting light work on the unit requiring tactile 
dexterity. 

Safety Glasses

 - when conducting any cleaning/cutting operation 

or exchanging filters. 

Reusable Half Mask Respirators 

- when replacing filters which 

have been in contact with normal room or environmental air.

Nuaire would always recommend a site specific risk assessment by a 
competent person to determine if any additional PPE is required. 

2.0 INTRODUCTION

Nuaire’s First Fix and Acoustic Solution system is designed to not only 
significantly reduce noise but to improve the installation when wall or 
cupboard mounting the MRXBOX(AB)-ECO2 MVHR Units.

Offering a complete MVHR acoustic and first fix solution to overcome 
both noise and ease the installation of heat recovery units.

Nuaire’s system addresses both duct and breakout noise; provides an 
aesthetically pleasing cupboard installation for the home occupant and 
reduces installation errors and time.

Information shown refers to complete system, not all parts will be 
relevant if part of system is fitted.

3.0  MECHANICAL INSTALLATION

Installation must be carried out by competent personnel in 
accordance with the appropriate authority and conforming to all 
statutory governing regulations.

No boarding should take place until after the full system installation 
has been completed.

Please note a clear working space is required around the  
installed MVHR unit to allow the cover to be removed and provide 
sufficient access for maintenance such as filter change.

Please allow a minimum of 430mm in front of the MRXBOX-ECO2 unit 
and 360m in front of the MRXBOXAB-ECO2.

The fan must be installed indoors, on a suitable wall away from direct 
sources of frost, heat and water spray or moisture generation.

For a vibration-free result the unit must be mounted to a solid wall.

For further installation information for the MVHR unit please refer to 
installation document supplied with the unit.

Содержание MRXBOX-SIL2

Страница 1: ...t Protective Steel Toed Shoes when handling heavy objects Full Finger Gloves Marigold PU800 or equivalent when handling sheet metal components Semi Fingerless Gloves Marigold PU3000 3DO or equivalent...

Страница 2: ...ing length of self adhesive seal to the top surface of the MRXBOX SIL2 to form a sealed perimeter around each circular cut out Figure 3 Ensure all joins are mated neatly to prevent leakage 2 3 MVHR Un...

Страница 3: ...and MRXBOX FF2 if this is not the case the MVHR unit should be fitted using the standard installation instructions supplied with that product If only fitting an MRXBOX SIL2 this should then be sat on...

Страница 4: ...9 2 6 4 4 3 8 7 6 1 6 6 Adjustable Feet 626 Wall Suitable structure Side view 445 605 417 CRS 353 172 CRS Top view 670 110 489 Side view 220 172 CRS 97 400 Face to be mounted nearest to wall 242 CRS...

Страница 5: ...led EPP plastic ducting nylon corner pieces plastic heat exchangers packaging material and other plastic components can be segregated into mixed plastic and widely recycled Cardboard packaging wood us...

Страница 6: ...6 20 07 20 Document Number 671802 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOX SIL2 MRXBOX FF2 Installation Manual NOTES...

Страница 7: ...7 20 07 20 Document Number 671802 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOX SIL2 MRXBOX FF2 Installation Manual NOTES...

Страница 8: ...8 20 07 20 Document Number 671802 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOX SIL2 MRXBOX FF2 Installation Manual NOTES...

Отзывы: