NuAire MRXBOX-ECO2-AE Скачать руководство пользователя страница 4

4

04. 12. 20. Document Number  671824

Nuaire | 

Western Industrial Estate 

Caerphilly 

CF83 1NA 

|

 

nuaire.co.uk

MRXBOX(AB)-ECO2-AE

Installation Manual

When using a “T” Piece to connect the CONTRAP drainage and 
the MVHR drain pipework the MVHR drain must always be fitted 
before the “T” Piece.

10 

Condensate Drain "T" Piece Installation

To SVP 

“T” piece 

MVHR Drain 

To unit 

To CONTRAP 

3.4 Extract & Supply Areas

The unit is designed to extract air from all wet rooms e.g. bathroom, 
kitchen, en-suite, utility room (with sink).  WC’s do not need to be 
ventilated if openable windows are fitted.

Supply air should be to all habitable rooms e.g. bedrooms and lounge. 
Extract / input grilles should be adjustable valve types (not supplied). 
External grilles are to have a minimum free area of 12,250 mm

2

.

3.5 Ducting

Before commencing ducting installation reference should be made 
to building regulations document “Domestic ventilation compliance 
guide”. This document supports ADF2010 and details installation, 
testing and commissioning of all ventilation systems.

If the enclosure is to be used in conjunction with an ancillary 
distribution box (MRXBOX-DB2) refer to additional assembly 
instructions supplied with the MRXBOX-DB2 as requirements will 
differ.

Otherwise fit 4x 125mm diameter plastic spigots with the self-tapping 
screws supplied to the spigot fixings plates found on the top panel of 
the enclosure, a bead of silicone should be applied to the groove of 
spigot fixing plate to prevent leakage (Figure 3).

It is recommended that rigid ducting be used at all times. Flexible 
ducting has a very high resistance and it is impossible to calculate how 
much resistance will be on a system if used.

If used the flexible ducting must be kept to a minimum and should 
always be pulled taut. A maximum of 300mm should be used on each 
leg.

To prevent condensation on the outside of the outside air inlet duct and 
the air outlet duct from the unit, these ducts should be insulated.

Ducting must be installed in such a way that resistance to airflow is 
minimised. Bends should be kept to a minimum.

A minimum distance of 300mm between the appliance and any bends 
in ductwork is recommended.

Ideally 125mm diameter or 220 x 90mm rectangular ducting should 
be used (Refer to dwelling design drawing, Figures 12 & 13 for further 
information).

Ducting joints must be sealed with silicone type sealant and shall be 
adequately and reliably fixed to the appliance.

Any air intake terminal MUST be installed in accordance with the 
appropriate regulation.

As a guide, the BS5440 series of British Standards deals with this 
issue and currently states that an air intake must be at a minimum 
distance of 300mm from a gas boiler balanced flue.

Installers are advised to be aware of the requirements of this 
standard when installing ‘through the wall’ supply air ducting.

3.6 Ventilation Flow Rates

3.6.1 ADF 2010 - Extract Ventilation Rates

 

Room

Min high rate

Min low rate

Kitchen

13 l/s

Total extract rate 

should be at least 

the whole dwelling 

ventilation rate given 

in table 2.

Utility Room

8 l/s

Bathroom

8 l/s

Sanitary 

Accommodation

6 l/s

3.6.2 Whole Dwelling Ventilation Rates

 
 

Number of bedrooms in dwelling

1

2

3

4

5

Whole dwelling 

ventilation rate 

(l/s)

1,2

13

17

21

25

29

1. In addition, the minimum ventilation rate should be no less than 

0.3 l/s per m2 of internal floor area.  (This includes all floors, e.g. 

for a two-story building add the ground and first floor areas).
2. This is based on two occupants in the main bedroom and a single 

occupant in all other bedrooms. This should be used as the default 

value. If a greater level of occupancy is expected add 4 l/s per 

occupant.

3.7 ADF 2010 Ventilation Calculations Design Of MVHR 
Systems

The MVHR system has been sized for the winter period. Additional 
ventilation may be required during the warmer months and it has 
been assumed that the provisions for purge ventilation (e.g. openable 
windows) could be used.

Step 1: 

For any design air permeability, determine the whole dwelling 

ventilation supply rate from 

Table 2.

As an alternative where the design air permeability is intended to be 
more than (>) 5m3/(h.m2) 50 Pa, allow for infiltration for all dwelling 
types by subtracting from the whole dwelling ventilation supply rate 

from Table 2;

 0.04 x gross internal volume of the dwelling heated 

space (m3).

Step 2:

 Calculate the whole dwelling extract ventilation rate by 

summing the individual room rates for ‘minimum high rate’ 

from Table 

1.

(For sanitary accommodation only, as an alternative, the purge 
ventilation provisions given in ADF 2010 can be used where security is 
not an issue. In this case ‘minimum high extract rate’ for the sanitary 
accommodation should be omitted from the step 2 calculation).

Step 3:

 The required airflow rates are as follows:

The maximum whole dwelling extract ventilation rate (e.g. boost) 
should be at least the greater of step 1 and step 2. Note that the 
maximum individual room extract rate should be at least those 
given in 

table 1.

The minimum air supply rate should be at least the whole building 
ventilation rate found in step 1.

For Scotland refer to BRE Digest 398.

For further information refer to “Domestic Ventilation Compliance 
Guide” www.planningportal.gov.uk/buildingregulations/approved 
documents/partl/compliance

Содержание MRXBOX-ECO2-AE

Страница 1: ...unless they have been given supervision or instruction concerning the safe use of the appliance by a person responsible for their safety Children shall not play with the appliance Cleaning and user m...

Страница 2: ...ON Installation must be carried out by competent personnel in accordance with the appropriate authority and conforming to all statutory governing regulations All mains wiring must be in accordance wit...

Страница 3: ...e Collar 9 Condensate Drain MVHR DRAIN Condensate Drain Uninsulated Drain Pipe With Min 5 Fall Running To SVP 3 2 1 Solid Wall Mounting Recommended The MVHR unit fixed to a solid wall construction usi...

Страница 4: ...40 series of British Standards deals with this issue and currently states that an air intake must be at a minimum distance of 300mm from a gas boiler balanced flue Installers are advised to be aware o...

Страница 5: ...very high moisture levels are likely to occur Therefore it is advisable that if the installation and building works are complete the unit is left running If the building works are not complete please...

Страница 6: ...n pipe with min 5 o fall running to SVP Insulated extract duct 12 Typical Ducted Arrangement For A Wall Mounted Unit Using Circular Ducting 3 10 2 Rectangular Ducting Exhaust air from kitchen bathroom...

Страница 7: ...panel of the enclosure should be removed by loosening the two screws the Ecosmart cable can then be connected to the underside of the MVHR unit within The cable should be fed through rubber blanking...

Страница 8: ...ms 6 3 Status Indication The status of the unit is indicated by a series of LED s on the front cover The variants are listed below The display on the unit control panel will not indicate when a higher...

Страница 9: ...ing nylon corner pieces plastic heat exchangers packaging material and other plastic components can be segregated into mixed plastic and widely recycled Cardboard packaging wood used filters and other...

Страница 10: ...10 04 12 20 Document Number 671824 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOX AB ECO2 AE Installation Manual NOTES...

Страница 11: ...11 04 12 20 Document Number 671824 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOX AB ECO2 AE Installation Manual NOTES...

Страница 12: ...12 04 12 20 Document Number 671824 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOX AB ECO2 AE Installation Manual NOTES...

Отзывы: