19. 11. 21. Document Number  672009

Nuaire | Western Industrial Estate | Caerphilly | CF83 1NA | nuaire.co.uk

MRXBOXAB-ECO3B-1Z(H)SW & MRXBOXAB-ECO5B-1Z(H)(SC/SW)

Installation Manual

3.2.1 Option 1 - Solid Wall

The MVHR unit fixed to a solid wall construction using the 

mounting bracket provided.

Ducting in the 
ceiling void.

Side view of unit 
mounted on the
block wall in a 
cupboard using 

MVHR-DRAIN

the wall brackets.

Condensate drain,
uninsulated drain 
pipe with min 5

o

 fall 

running to SVP.

Valve in ceiling.

Unit weight 

= 76kG

Solid Wall Mounted Unit Installation

3.2.2 Option 2 - Non-Solid Wall

If it is not practical to use a solid wall, the MVHR unit should be 
fixed to a stud partition with a 25mm minimum thickness MDF 
panel solidly fixed behind the plasterboard.

If fixing to a stud wall the MDF panel should extend, width wise, over a 
minimum of 3 vertical studs with centres of no more than 400mm. Add 
additional vertical supports if necessary. 

Height wise, ideally, the MDF panel should extend from floor to ceiling 
but as a minimum should be a least 2m high.

Fix the mounting bracket to the wall (Figure 3) and use the wall 
mounted bracket to mount the unit on (Figure 5).

 
 

Non-Solid Wall Mounted Unit Installation

Ducting in the 
ceiling void.

Side view of unit 
mounted in a 

with the 25mm 

cupboard fixed to 
a stud partition

MDF fixed behind 
the plasterboard
using the wall 

MVHR-DRAIN

brackets. 

Condensate drain,
uninsulated drain 
pipe with min 5

o

 fall 

running to SVP.

Valve in ceiling.

Unit weight 

= 76kG

3.3 Condensate Drain

The MVHR unit inside the enclosure is fitted with a straight coupling to 
allow 21.5mm overflow pipe (not supplied) to be attached using solvent 
cement, the pipe should be passed through the flexible adhesive backed 
cover plate before the solvent cement is applied.

The pipe can then be inserted into the coupling of the MVHR unit and 
the cover plate slid along the length to bond against the base panel of 
the enclosure preventing noise breakout (Figure 7).

 

Condensate Pipe Installation

Solvent cement to be applied

Flexible adhesive backed 
cover plate

Overflow pipe

The condensate must be discharged under a water level in a U-trap 
drainpipe or an alternative drain method which acts as an airlock. This 
condensate discharge connection is suitable for 21.5mm Ø overflow 
pipe. Solvent cement should be used to make the joint. 

If using a U-trap please ensure the U-trap has been filled to a suitable 
level of water to avoid any air locks. If the condensation pipe is fitted in 
an unheated space the pipe should be in insulated to prevent freezing.

An MVHR-DRAIN is recommended for use as the primary 
condensate take-off (Figures 8 and 9).

 

 

 
 

Min 5

Drop

Condensate Trap Installation

Condensate pipe connection to 
unit and a typical example of a 
“U” trap drainpipe 

(Standard 

configuration only).

Collar

MVHR-DRAIN Installation

Condensate drain, 
uninsulated drain pipe with 
min 5° fall running to SVP.

Содержание MRXBOX-ECO-AE

Страница 1: ...cerning the safe use of the appliance by a person responsible for their safety Children shall not play with the appliance Cleaning and user maintenance shall not be carried out by children 1 1 Hazard...

Страница 2: ...ont of an MRXBOXAB ECO 3 5 B unit The fan must be installed indoors on a suitable wall away from direct sources of frost heat and water spray or moisture generation For a vibration free result the uni...

Страница 3: ...ing the wall MVHR DRAIN brackets Condensate drain uninsulated drain pipe with min 5o fall running to SVP Valve in ceiling Unit weight 76kG 3 3 Condensate Drain The MVHR unit inside the enclosure is fi...

Страница 4: ...s 1 2 13 17 21 25 29 Notes 1 In addition the minimum ventilation rate should be no less than 0 3 l s per m of internal floor area This includes all floors e g for a two story building add the ground...

Страница 5: ...is advisable that if the installation and building works are complete the unit is left running If the building works are not complete please close the air valves or cover up the air valves to prevent...

Страница 6: ...ted drain pipe with min 5 o fall running to SVP MVHR unit Nuaire MVHR DRAIN Condensate drain uninsulated drain pipe with min 5 o fall running to SVP 3 9 2 Rectangular Ducting 13 Typical Rectangular Du...

Страница 7: ...And Bathroom 15 Wiring Diagrams Unit Serving Kitchen And Bathroom ECO3 3A Fuse BS 1362 ECO5 5A Fuse BS 1362 MAINS 230V 50Hz Light Room Light Switch Double Pole N L 3 Pole Isolator Kitchen Switch Blue...

Страница 8: ...rom the wet rooms When the unit senses that the humidity exceeds the set point the unit will boost to that set by the commissioned boost speed The set point can be found behind the front of the unit F...

Страница 9: ...e a full description of the part required The serial number will be found on the identification plate attached to the unit casing Telephone 02920 858 400 aftersales nuaire co uk Technical or commercia...

Страница 10: ...10 19 11 21 Document Number 672009 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOXAB ECO3B 1Z H SW MRXBOXAB ECO5B 1Z H SC SW Installation Manual NOTES...

Страница 11: ...11 19 11 21 Document Number 672009 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOXAB ECO3B 1Z H SW MRXBOXAB ECO5B 1Z H SC SW Installation Manual NOTES...

Страница 12: ...12 19 11 21 Document Number 672009 Nuaire Western Industrial Estate Caerphilly CF83 1NA nuaire co uk MRXBOXAB ECO3B 1Z H SW MRXBOXAB ECO5B 1Z H SC SW Installation Manual NOTES...

Отзывы: