MR-ECO-COOL-V

Installation Manual

Airflows of less than 50 l/s may cause the in-built thermal overload 
protection to activate to protect the unit. Ensure airflows are 
balanced and commissioned in accordance with the original design 
criteria. 

The Cooling module MUST not be run without the specified 
minimum airflow. This can result in the compressor overheating 
and may invalidate the warranty. 

Typical installation is Floor Mounted using (ECO5-AE-1Z-STND). 

4.2 Unit Installation 

 
 

 
 

Unit Access

A-A

B-B

A

A

B

B

STANDARD HAND

FRONT ACCESS

OPPOSITE HAND 

FRONT ACCESS

STANDARD HAND 

INSTALLATION

OPPOSITE HAND 
INSTALLATION

ACCESS PANEL TO 

EVAPORATOR COIL

ACCESS PANEL TO 

CONDENSER COIL

FRONT

FRONT

Following the MRXBOXAB-ECO5-AE(OH)CV being levelled and 
installed on ECO5-AE-1Z-STND.

The supplied gaskets must be installed as shown in Figure 6. Remove 
the backing paper of the foam gaskets adhesive side down and align 
with the holes of the MVHR unit.

Lift the cooling module (Section) above the MVHR unit and lower 
into place. 

Do not drag the unit over the foam gaskets as this may 

damage foam gaskets.

 

Once in position secure the side brackets with the fixings supplied 
(fitted to the units) and secure the top of the unit to a suitable surface 
with the adjustable top bracket supplied (Figure 6).  

 
 

 
 

Foam Gasket Installation

x4 Foam Gaskets 
(Adhesive side down)

Top 
Bracket

Side 
Bracket

4.2.1 Opposite Handed Units

The Cooling Module can be installed on opposite handed MVHR units 
by rotating the module 180°. In doing this the drain, fly lead and access 
to coils will be flipped to the opposite side. The drain position will be 
located towards the front at the bottom of the unit. 

4.3 Condensate Drain Installation

The unit provides an external 15mm Ø condensate drain pipe fitted 
flush to the outer case to minimise its foot print. Conventional push on 
plumbing connections, connect to the drain (MAX Outer Diameter of 
fitting: 37mm). 

Ensure the cooling module is installed level.  

If the condensate pipe is fitted in an unheated space the pipe should be 
in insulated to prevent freezing. Ensure the cooling module has its own 
dry trap separate to the MVHR.

4.3.1 Standard Hand Installation

The drain is positioned at the rear bottom corner on the right-hand side 
panel on a standard hand unit. 

4.3.2 Opposite Hand Installation

The unit is rotated 180°, positioning of the drain towards the front, at 
the bottom corner on the left-hand side panel.  

 

Condensate Pipe Connection

5.0 DUCTING

Before commencing ducting installation reference should be made 
to building regulations document “Domestic ventilation compliance 
guide”. This document supports ADF2010 and details installation, 
testing and commissioning of all ventilation systems. 

It is recommended that rigid ducting must be used it all times. Fresh-air 
Intake and stale air Exhaust ducts will carry cold air in winter. Supply 
air duct will carry cold air when Cooling Module is operating. Therefore 
Intake, Exhaust and supply ducts will be at risk of condensation forming 
on external surfaces and should all be thermally insulated. 

Any duct component including ancillaries such as carbon filters must 
be insulated if they are carrying colder air produced by the cooling 
module. Flexible connections should be avoided. Nuaire Ductmaster 
thermal ducting should be used on Intake, Exhaust and Supply duct 
runs. If flexible connections cannot be avoided, FLDI150 Insulated 
Flexible Duct should be used.

Ducting must be installed in such a way that resistance to airflow is 
minimised. Bends should be kept to a minimum. 

Ducting joints must be sealed with suitable duct sealant and needs to 
be taped. Ducting shall be adequately and reliably fixed.

Ducting to cooling module must be securely fixed with screws to the 
spigots to prevent access to live parts. 

Содержание MR-ECO-COOL-V

Страница 1: ...ervice agent or similarly qualified persons in order to avoid a hazard When installing the unit take care not to damage electrical or other hidden components do not drill the unit casing Precautions m...

Страница 2: ...information on the safe and appropriate assembly transport commissioning operation maintenance disassembly and simple troubleshooting of the product While the product has been manufactured according...

Страница 3: ...side and top brackets replace the lifting eyelet with the supplied plug to ensure the unit is sealed 1 Airflow Through Unit STANDARD HAND OPPOSITE HAND Condensate Drain Condensate Drain EXHAUST TO OU...

Страница 4: ...y governing regulations All mains wiring must be in accordance with the current I E E Regulations or the appropriate standards Ensure that the mains supply Voltage Frequency and Phase complies with th...

Страница 5: ...ondensate drain pipe fitted flush to the outer case to minimise its foot print Conventional push on plumbing connections connect to the drain MAX Outer Diameter of fitting 37mm Ensure the cooling modu...

Страница 6: ...lves at low airflows If this occurs the airflow should be increased 7 0 ELECTRICAL INSTALLATION 7 1 Electrical Details Voltage 230V 1ph 50Hz Running Current 3 5 A This unit must be earthed 7 2 Wiring...

Страница 7: ...on the MVHR unit providing the air flow through the cooling module please refer to MRXBOXAB ECO5 AE OH CV installation manual Document number 671861 10 0 MAINTENANCE Isolate before commencing work mak...

Страница 8: ...fully recycled EPP plastic ducting nylon corner pieces plastic heat exchangers packaging material and other plastic components can be segregated into mixed plastic and widely recycled Cardboard packag...

Отзывы: