Installation Manual

2.0 INTRODUCTION

The ES-ISC-WP range is designed to protect the Ecosmart speed control 
unit from adverse weather conditions. The product is suitable for wall 
mounting, can be retrofit on site and is available in the sizes shown 
below.

2.1 Dimensions (mm) & Weights (kg)

Unit Code

Suitable for 

use with

Height 

(mm)

Width 

(mm)

Depth 

(mm)

Weight 

(Kg)

ES-ISC-WPA

ES-ISC1.2A  

ES-ISC4.1A

626

477

285

10

ES-ISC-WPB

ES-ISC5.6A 

-  

ES-ISC23.1A

687

560

341

14

ES-ISC-WPC

ES-ISC26.0A 

ES-ISC38.0A

1070

415

692

27

ES-ISCT-WP

ES-ISCT1.2A 

-  

ES-ISCT23.1A

758

560

344

14

3.0 DELIVERY & HANDLING

All equipment is inspected prior to despatch and leaves the factory in 
good condition. Upon receipt of the equipment an inspection should be 
made and any damage indicated on the delivery note. 

Particulars of damage and/or incomplete delivery should be endorsed 
by the driver delivering the goods before offloading by the purchaser. 
No responsibility will be accepted for damage sustained during the 
offloading from the vehicle or on the site thereafter. All claims for 
damage and/or incomplete delivery must be reported to Nuaire within 
two days of receipt of the equipment. 

The weight of the unit modules and palletised items are displayed 
on the packaging. Some of the modules have an uneven weight 
distribution, and this will be indicated by labelling where appropriate.

Offloading and positioning of the equipment is the responsibility of 
the purchaser. Items should only be lifted by competent personnel 
following appropriate risk assessment.

Always handle with care to avoid damage and distortion, and where 
lifting slings are employed use spreaders to ensure slings do not come 
into contact with the unit case, or control pack.

 

Assembly with

base frame

Palletised

Forklift

Slings via spreaders fitted to unit
with base frame.

Typical Lifting Methods

4.0 MECHANICAL INSTALLATION

Installation must be completed by competent persons, in accordance 
with good industry practice and should conform to all governing and 
statutory bodies i.e. IEE, CIBSE, etc.

The operating range is -10°C to 40°C, up to 85% relative humidity 
(non-condensing). Installation in unventilated loft is not 
recommended.

Fix or mount in upright position to a secure vibration free vertical 
surface (Figures 1 & 2). Ensure the ventilation grilles are free of 
obstruction.

4.1 Fixings

The fixings to secure the weatherproof enclosure to the wall are not 
supplied and must be sourced by the customer to be specific for the 
individual installation.

4.2 Drill Hole Pattern 

 

A

B

Drill Hole Pattern

Unit Code

A (mm)

B (mm)

ES-ISC-WPA

379

391.5

ES-ISC-WPB

417

476

ES-ISC-WPC

768

608

4.3 Installation Procedure

Remove screws (8) from outer casing of the weatherproofing box 
(Figure 3). Outer casing releases from the inner housing and can 
now be lifted away (Figure 4).

Offer the inner housing to the wall (or mark from the appropriate 
drill pattern) (Figure 2), drill and fix the inner housing to the wall 
using appropriate fasteners.

Remove the front cover of the Ecosmart speed control and 
disconnect any cooling fans fitted.

Making use of the brackets provided, sit the Ecosmart speed 
control box within the inner housing of the weatherproofing and 
affix to the weatherproofing inner housing using screws (4) (not 
provided, Nuaire recommend M5 x 25 screws) (Figure 5). It may 
also be easier to connect the field wiring at this stage.

Reattach speed control cover ensuring cooling fans are connected.

Reassemble outer casing.