![Nuaire Group XBOXER-MICRO Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/nuaire-group/xboxer-micro/xboxer-micro_installation-and-maintenance-manual_1716131006.webp)
The filters fitted inside the unit are protected with a
plastic film. Prior to commissioning remove the covers
(fig 13), take off the film and replace.
Isolation - Before commencing work make sure that
the unit, switched live and Nuaire control are
electrically isolated from the mains supply and
switched live supply.
6
Leaflet Number 671597 January 2013
Installation and Maintenance
XBOXER-MICRO Mechanical Ventilation with Heat Recovery & Summer Bypass
Technical or commercial considerations may, from time to time, make it necessary to alter the design, performance and
dimensions of equipment and the right is reserved to make such changes without prior notice.
Run On Trickle Boost Trickle Boost Power Fan
Failure
6.0 Commissioning
1. For the required air flow rates please refer to the design
specification for the property, follow 2.4, or refer to building
regulations ADF 2006/2010.
2. The unit is supplied with independent control for both normal
and boost airflows. (see fig. 9).
3. Correct commissioning is essential to ensure the ventilation
air flowrates are met. It also ensures the unit is not over
ventilating and causing excessive power consumption.
4. Commissioning should be carried out in accordance with
building regulations document “Domestic ventilation
compliance guide”. A calibrated moving vane anemometer
and hood will be required to carry out commissioning.
5. Adjustment valves should be locked in place to prevent
further adjustment.
6. Once commissioned the home owner / tenant should be
informed that the unit should not be adjusted as it will have
a detrimental effect on the indoor air quality and could result
in condensation and mould growth. The label covering the
control has an adhesive panel which should be removed post
commissioning to prevent tampering.
Figure 9. PCB inside enclosure.
7.0 Maintenance/Cleaning
We recommend that the two G3 fiters are inspected after
6 months, and replaced every 12 to 18 months.
The filters can be removed from the unit by removing the two
filter cover plates on the bottom panel of the unit.
The filter can now be extracted by pulling the removal loop on
the edge of the filter. Once the filters have been inspected
return or replace them as necessary.
Inspect the heat exchanger every 5 years. Generally check
for damage and security of components. Refit cover.
8.0 Replacement of Parts
Should any component need replacing Nuaire keep extensive
stocks for quick delivery. Ensure that the unit is electrically
isolated, before carrying out any work.
Note: The supply cable must be replaced by an electrically
competent person.
When ordering spare parts, please quote the serial number
of the unit and the ARC number of the purchase if possible.
(This information will be available on the fan label).
9.0 Warranty
The 5 year warranty starts from the day of delivery and
includes parts and labour for the first year and parts only for
the remaining 4 years. This warranty is conditional on planned
maintenance being undertaken
.
10.0 Service Enquiries
Nuaire can assist you in all aspects of service. Our service
department will be happy to provide any assistance required,
initially by telephone and If necessary arrange for an
engineer to call.
Customer Services Department
on 08705 002 555