background image

 

VS80-130 

Natural Draft - Installation & Operation Instructions 

 

Triton 

 

 

 

11 

Combustion Air 

Natural Draft appliances require an adequate amount of combustion air to sustain proper combustion and prevent 
flue gas leakage. The appliance’s air-inlet draws combustion air from Indoors or Outdoors depending on whether 
there is a sufficient natural infiltration (air changes) occurring to sustain combustion. If the building is newer and 
relatively  air  tight,  outdoor  air  should  be  considered.  For  recommended  practice,  refer  to  NFPA  31  (USA)  or 
CSA B139 (Canada).  

 

Air Circulation

 - The boiler shall be located so as not to interfere with proper circulation 

of combustion, ventilation, and dilution air. 

 

Make-up Air

 - The operation of exhaust fans, kitchen ventilation systems, clothes dryers, 

and  fireplaces  must  be  considered  in  determining  the  adequacy  of  a  space  to  provide 
combustion  air  requirements.    Failure  to  ensure  adequate  make-up  air  to  all  appliances 
may result in flue gas leakage, personal injury or death. 

 

Permanent Openings for Combustion Air 

The appliance space or boiler area requires a permanent opening(s) capable of providing adequate combustion air 
to the boiler.  If using two  permanent openings, one opening must be within 12 inches of the ceiling, the other 
within 12 inches of the floor. The minimum dimension of air openings to the appliance space shall not be less 
than 3 inches in any one direction, including rectangular ducts. Round ducts are connected to the permanent air 
openings;  duct  sizes  must  have  a  minimum  cross-sectional  area  of  3  inches.  See 

“Sizing  Combustion  Air 

Openings”

 for more details. 

 

The minimum size of permanent openings and how combustion air is supplied to them depends on three factors: 
1.

 

What is the input capacity of the boiler in Btu/hr? 

2.

 

How is the Combustion Air being supplied? 

3.

 

Is make-up air required for other appliance in the room competing for the same air? 

 

 

Sizing Combustion Air Openings 

The  following  sections  detail  the  three  (3)  methods  for  determining  the  minimum  opening  size  and  location 
required for providing combustion air:  

 

1.

 

Indoor Air - Opening Sizes: 

Older buildings typically have sufficient ventilation due to air leakage around 

single pane windows, poorly weather-stripped doors, and non-existent vapour barrier. Indoor air can be used 
to supply combustion air to the boiler area if the air infiltration rate is adequate, i.e. greater than 0.4 ACH (air 
changes per hour) or when the boiler area and communicating spaces have a minimum volume of 50 cubic ft 
per 1000 Btu/hr. If the air infiltration rate is known to be less that 0.4 ACH, refer to the Installation Code for 
Oil-Burning Equipment for further guidance. 

 

a.

 

Combined spaces on the same story 

 

minimum free area of openings = 1 in.

2

/1000 Btu/hr of  total input rating of all appliances in the space. 

 

not less than 100 sq. in.  

 

two openings required - one within 12 in. from ceiling, other within 12 in. from floor  or bottom of the 

enclosure.  

 

minimum dimension of air openings shall be not less than 3 in. 

 

b.

 

Combined spaces in different stories

 

 

Volume  of  spaces  in  different  stories  shall  be  considered  as  communicating  spaces  where  spaces 
connected by one or more openings in doors or floors having a total minimum free area of 2 in.

2

/1000 

Btu/hr of total input rating of all appliances. 

 
 
 
 
 
 
 

Содержание Triton VS80-130

Страница 1: ...will result in serious injury or death Warning Sign Indicates a hazardous situation which if not avoided could result in serious injury or death Caution Sign plus Safety Alert Symbol Indicates a hazardous situation which if not avoided could result in minor or moderate injury Caution Sign without Safety Alert Symbol Indicates a hazardous situation which if not avoided could result in property dama...

Страница 2: ...ed service technician 3 Check the boiler area for proper clearances 4 Turn the thermostat s up 5 Turn the emergency power isolation switch on 6 If ignition does not occur follow the instructions To Turn Off Oil Boiler and call a qualified service technician TO TURN OFF OIL BOILER_ 1 STOP Read the safety information above very carefully 2 Turn off emergency power isolation switch Should be mounted ...

Страница 3: ...cument prior to proceeding with the installation of the Triton Failure to follow the instructions outlined in this document will result in property damage serious injury or death User Responsibilities This boiler must be installed and serviced by a qualified installer or service technician This boiler must be serviced and inspected annually As the User Owner of this equipment you are responsible f...

Страница 4: ... Coil Riello Burner VS80 VS80 1F2A1 VS160 497 308 F3 C85 10618 84024 0 65 60 o B 84787 12501 81342 83604 13701 82905 VS90 VS100 VS120 VS80 1G2A1 F5 C85 10630 3 0 85 60 o B VS130 Becket Burner VS80 VS80 1P2A1 NYC601 81031 3 0 75 70 o B 84787 12501 81342 83604 13701 82905 VS90 VS100 VS120 VS160 1P2A1 NYC602 81032 3 1 10 60 o B VS130 Notes 1 Boiler manual packaged with the Burner Kit 2 Nozzle size in...

Страница 5: ...nergy ratings have been confirmed by AHRI 2 Models VS80 100 F3 burners have an insertion depth of 2 375 3 Models VS120 130 F5 burners come assembled with an insertion depth of 2 375 Table 2 2 Beckett Burners with Triton Boilers Boiler Model Input GPH US Heating Capacity MBH Net I B R Rating Water MBH AFUE Efficiency Pump PSIG Delevan Nozzle Recommended Burner Settings Burner Head Shutter Band VS80...

Страница 6: ...learances are for ease of piping installation annual maintenance and service access Refer to Table 3 1 and Figure 3 1 Table 3 1 Minimum Clearances for Installation and Service Clearances Dimensions inches mm Front Rear Top Right Side Coil Side Flue Pipe 1 2 Floor To Combustibles 24 610 5 124 24 610 5 124 24 610 9 228 Non combustible Recommended 36 915 24 610 24 610 24 610 24 610 9 228 Non combusti...

Страница 7: ...right panels alongside the boiler Figure 4 1 5 Attach front and back panels positioning them over the side panels Figure 4 2 6 Mount top panels front and rear over water pipes and smoke hood Figure 4 3 7 Fully tighten all jacket screws to secure panels in place 8 Mount Tridicator and Well on the boiler as shown Figure 4 4 9 Position the HydroStat 3250 over well and secure in place from underneath ...

Страница 8: ...urner manufacturers instructions included with the burner b Refer to specification Tables 2 1 to 2 4 to determine the appropriate nozzle size for the boiler output See Attention Nozzle Sizes in Section 2 0 c Riello Burners extra step required Mount the burner gasket and burner flange to the boiler Secure to the boiler using washers and nuts provided Figure 4 5 Seal around the burner gasket and the...

Страница 9: ...ation Prepare the burner as per the burner manufacturer s instructions Refer to Tables 2 1 to 2 2 for nozzle sizes burner settings insertion depths air settings and specifications Burner Gasket Burner Flange Burner Washers and Nuts Blast Tube Set insertion depth Tables 2 1 to 2 4 Blast Tube Ring ...

Страница 10: ...s free to operate without sticking for this will affect the boiler s combustion system It is important that the draft be adequate because poor draft conditions will cause poor operation and a possible hazardous condition Draft Settings The Triton is designed to operate with a 0 04 w c draft in the flue breaching therefore ensure there is enough natural or mechanical draft for proper operation Due ...

Страница 11: ...f 3 inches See Sizing Combustion Air Openings for more details The minimum size of permanent openings and how combustion air is supplied to them depends on three factors 1 What is the input capacity of the boiler in Btu hr 2 How is the Combustion Air being supplied 3 Is make up air required for other appliance in the room competing for the same air Sizing Combustion Air Openings The following sect...

Страница 12: ... with the outdoors or shall communicate through a vertical or horizontal duct to the outdoors or spaces that freely communicate with the outdoors and shall have a minimum free area of the following 1 in 2 3000 Btu hr of the total input rating of all appliances located in the enclosure Not less than the sum of the areas of all appliances vent connectors in the space 3 Combination Indoor and Outdoor...

Страница 13: ...cting the flow of combustion gases See warning titled Restrictions 5 Chimney Connections Use thimble or slip joint where breeching enters chimney to allow for removal for cleaning and servicing 6 Avoiding Obstructions Ensure breeching does not protrude so far into the chimney that it will cause obstruction Avoid connecting near the bottom of chimney as blockages may result 7 Draft Regulator Ensure...

Страница 14: ...S80 5 8 x 8 1 6 15 6 VS90 VS100 VS120 VS130 Notes 1 6 3 4 x 6 3 4 inside liner 2 Excessive breeching length or too many elbows and or tee will cause restriction Figure 5 1 Breeching Blocked Vent Switch Blocked Vent Switch Install the switch 6 8 above the boiler breeching refer to instructions included with kit mandatory in Canada Blocked Vent Switch Draft Regulator Secure breeching using minimum o...

Страница 15: ...icator is factory supplied and must be field installed in the front of the boiler or on the coil plate Relief Valve A 30 psi relief valve is factory supplied and must be field installed Piping The closed loop piping system must be in accordance with the central heat piping illustration All piping joints must be secure and water tight or the boiler warranty is void Water Supply Pressure regulating ...

Страница 16: ...ter Circulator location may vary from one application to another Heating Return Heating Supply Inlet Drain Relief Valve Water Supply Expansion Tank Air Vent Pump Bypass optional DHW to Fixtures Cold Water Supply Drain Valve back flushing Unions for servicing Tempering Valve mandatory Isolation Throttle Valves Coil Inlet Coil Outlet ...

Страница 17: ...emand controller will apply Thermal Targeting WWSD Outdoor Temperature Sensor Factory Supplied Connecting the OD Sensor to WWSD and C enables the Warm Weather Shutdown feature of the controller Control will not respond to T T demands when the outdoor temperature is above the WWSD setting C Outdoor Temperature Sensor Factory Supplied Connecting the Outdoor Sensor to OR and C disables Thermal Target...

Страница 18: ...allation Checklist VS80 130 18 Figure 7 1 Triton Wiring Diagram Burner Primary Safety The Blocked Vent Switch and any other limit device must break power to the burner primary B1 Failure to follow these instructions may result in serious injury or death ...

Страница 19: ...lt in property damage Cold Start Will Void Warranty Upon power up to the control increase the LO TEMP setting to a minimum of 120 o F Failure to do so will permit the unit to operate as a cold start boiler and void the warranty HydroStat 3250 For complete installation details and instructions on controls operation refer to the manufacturer s instructions included with the Fuel Smart HydroStat 3250...

Страница 20: ...tes Pur when control is in Thermal Pre Purge mode o To set Thermal Pre Purge ON perform the following steps 1 Turn the LO TEMP dial to Pro 2 Turn the HI TEMP dial to select feature 1 3 Push the Test Settings Button to turn Thermal Pre Purge ON or OFF 4 Reset LO TEMP and HI TEMP settings to desired temperatures Zone Indirect Switch Determines the function of the ZC ZR input o Switch Z Zone ZC ZR de...

Страница 21: ...rgeting is overridden when Economy Feature is set to OFF i e central heat demands operate to the HI TEMP setting A central heat demand is activated by a T T demand or ZC ZR demand when the Zone Indirect switch is set to Z With an Outdoor Sensor connected to WWSD and C the control will perform Warm Weather Shutdown and Thermal Targeting With an Outdoor Sensor connected to OR and C the control will ...

Страница 22: ... Setting for Outdoor Reset Boiler Temperature ºF Reset Ratio Chart 200 1 25 1 25 1 25 1 50 1 50 1 50 1 50 1 75 1 75 2 00 2 00 2 25 2 50 2 50 2 50 2 50 2 50 2 50 195 1 00 1 25 1 25 1 25 1 50 1 50 1 50 1 50 1 75 1 75 2 00 2 25 2 25 2 50 2 50 2 50 2 50 2 50 190 1 00 1 00 1 25 1 25 1 25 1 50 1 50 1 50 1 75 1 75 2 00 2 00 2 25 2 50 2 50 2 50 2 50 2 50 185 1 00 1 00 1 00 1 25 1 25 1 25 1 25 1 50 1 50 1 ...

Страница 23: ...ping and boiler are free from leaks 5 Ensure Oil Supply tank is properly installed and vented as per applicable standards 6 Oil line is secured to the burner in accordance with the burner manufacturers instructions 7 Oil line is purged and free from leaks 8 Do not start burner unless smoke hood clean out door HydroStat 3250 breeching and burner door are secured 9 Burner has power and burner switch...

Страница 24: ...structions in Section 4 0 2 Use the recommended air settings in Table 2 1 to 2 4 as a guideline 3 Final adjustments should be made using test equipment and by verifying the CO2 is between 11 13 4 To accurately set the combustion system first establish a stable firing condition with a 1 smoke 5 Increase the air setting slightly until a 0 smoke is obtained 6 Establish a minimum of three 5 minute bur...

Страница 25: ...d 1 Check the boiler area for proper clearances to combustibles 2 Inspect the boiler before preparing for start up 3 Ensure there is oil in the oil tank 4 Open the oil supply valve and ensure are no leaks 5 Turn the thermostat s up 6 Turn the emergency power isolation switch on If the burner has shut down on safety locate the red reset button on the burner and depress it the burner should restart ...

Страница 26: ...comply with handling instructions in Table 9 1 may result in serious injury long term health problems or death Table 9 1 Handling Instructions for Fiberglass and Ceramic Fiber Materials Reduce the Risk of Exposure Precautions and Recommended Personal Protective Equipment Avoid contact with skin and eyes Wear long sleeved loose fitting clothing gloves and safety glasses or goggles Avoid breathing i...

Страница 27: ...ng on which model number is being referenced Building Owners Replacement parts are available from your stocking wholesaler Contact your local Installer or Wholesaler for assistance with parts Wholesalers Contact NY Thermal Inc directly when ordering replacement parts 1 506 657 6000 Installers Contact NY Thermal Inc directly if technical assistance required 1 800 688 2575 Figure 10 1 Boiler Coil an...

Страница 28: ...ck insulated 12 TBD VS80 130 Jacket Front insulated 13 TBD VS80 130 Jacket Right Side insulated 14 TBD VS80 130 Jacket Coil Side insulated 15 TBD VS80 130 Jacket Top Back Large insulated 16 TBD VS80 130 Jacket Top Front Small insulated 17 505 VS80 130 Flue Baffle 8 Zig Zag 24 unit 18 13304 VS80 130 Combustion Chamber Insert 19 10618 VS80 100 Burner Riello F3 20 84024 VS80 100 Blast Tube Riello F3 ...

Страница 29: ...pressure vessel beginning from the date of installation without however covering the installation itself Basic Coverage warranty period will commence from the date of manufacture if the installation is NOT registered at www ntiboilers com products product registration html within 6 months of installation EXTENDED COVERAGE We will repair or replace a defective pressure vessel for a period of eleven...

Страница 30: ... In The Case of A Warranty Service Problem 1 Contact your installing contractor or service provider Do not call NTI 2 If your contractor or service representative requires further help they will contact us directly 3 If you cannot contact your contractor or service representative contact us at 1 506 657 6000 to the attention of the Service Department NOTE NTI cannot provide technical assistance to...

Страница 31: ...VS80 130 Parts List Installation Operation Instructions Triton 31 NOTES ...

Страница 32: ...n Installation and Operation Instructions Parts List VS80 130 32 NY Thermal Inc 30 Stonegate Dr Saint John NB E2H 0A4 Canada Technical Assistance 1 800 688 2575 Website www ntiboilers com Fax 1 506 432 1135 ...

Отзывы: