background image

 

 ATTENTION:   LIQUEFIED PETROLEUM (LP) PROPANE 

 

The Trinity boiler is set to operate with Natural Gas; LP Conversion Kit Part No. 82650-1 for

 

Ti100’s, Ti150’s and 

Ti200’s, or LP Conversion Kit Part No. 83017-1 for Ti400’s is included with each boiler and must be installed before 
operating with Propane.

 

Liquefied Petroleum (LP) propane gas is heavier than air; it is imperative that your boiler is not installed in a pit or 
similar location that will permit heavier than air gas to collect. Local Codes may require appliances fueled with LP gas 
be provided with an approved means, of removing unburned gases from the room. Check your local codes for this 
requirement. 

Warning

 

THIS BOILER MUST HAVE WATER 
FLOWING THROUGH IT WHENEVER 
THE BURNER IS ON. FAILURE TO DO 
THIS WILL DAMAGE THE UNIT AND 
VOID THE WARRANTY.

 

0

100

200

300

400

0-

2000

3000

4000

5000

6000

7000

8000

9000 10000

Elevation (ft)

Input

 (

M

bh)

Ti150

Ti200

Ti400

Ti100

1.0 SPECIFICATIONS 

 

   

Description 

Ti 100 

Ti 150 

Ti 200 

Ti 400 

Input (BTUx1000) 

Input Capacity - Max. / 

Min.

  

Natural =100 / 

15

  

Propane= 100 / 

15

 

Natural =150 / 

25

  

Propane= 145 / 

25

 

Natural = 200 / 

25

 

Propane= 194 / 

25

  

Natural = 399 / 75 
Propane= 399 / 7

5

  

Output (BTUx1000) 

Output Capacity - Max./ 

Min.

 

Natural =92.7 / 13.9 

Propane = 92.7/ 13.9 

Natural =139 / 23.2 

Propane = 134 / 23.2 

Natural = 185 / 23.2 

Propane = 180 / 23.2 

Natural = 370 / 69.5 

Propane = 370 / 69.5 

Steady State Efficiency 

95% 

95% 

94% 

94% 

AFUE Efficiency 

95.1% 

Venting material 

CPVC, PVC (See Section 3.1) 

Max. Vent lengths Natural Gas 

3” @ 105’ Equivalent 

Max. Vent lengths Propane

 

 

3” @ 105’ Equivalent 

3” @ 50’ Equivalent 

4” @ 30’ Equivalent  
6” @ 65’ Equivalent  

Weight 

80 lbs. 

80 lbs. 

110 lbs. 

205 lbs. 

Dimensions L-W-D (Inches) 

22.5x15.25x14 22.5x15.25x14 

22.5x15.25x17.25 

23.5x21x36 

Clearance to Combustibles 

0” 

1.1 High Altitude Operation 

The Trinity boiler is designed to operate to capacity in 
installations with 2000 feet of elevation or less. As 
elevations higher than 2000 feet have less dense air, the unit 
is not capable of providing its specified capacity.  (See 
Chart). 
 

In Canada:

 

 

De-rate by 5% for altitudes between 2000 and 4500 feet.  
For altitudes above 4500 feet consult with local authorities. 

In USA: 

De-rate by 4% for every 1000 feet over 2000 feet.

 

 

CAUTION

   At elevations greater than 2000 feet, the 

combustion of the Trinity must be checked with a calibrated 
combustion tester to ensure safe and reliable operation.  
 
 
 
Consult Section 5.20 for instructions on adjusting the input to 
provide proper operation. 

It is the Installers responsibility to 

check the combustion, and to adjust the combustion in 
accordance to Section 5.2

 

 

2.0 INSTALLATION REQUIREMENTS 

Important: Carbon  Monoxide Detectors 

 

The installation of your NY Thermal Trinity gas boiler must 
conform to the requirements of your local authority, and the National Fuel Gas Code ANSI Z223.1 and or CAN/CGA B149 Installation 
Codes. Where required by the Authority, the installation must conform to the standard for “Controls and Safety Devices for Automatically 
Fired Boilers ANSI/ASME CSD-1. 

Содержание Trinity Ti 100

Страница 1: ...ne Valves 22 7 2 2 Multiple Zones with Taco Valve controller 23 7 2 3 Multiple Zones Pump controller 24 7 2 4 Multiple Temperature Zones with Injection Pumps 25 8 0 SENTRY 2100 CONTROLLER 26 9 0 LIGHT...

Страница 2: ...1 Venting material CPVC PVC See Section 3 1 Max Vent lengths Natural Gas 3 105 Equivalent Max Vent lengths Propane 3 105 Equivalent 3 50 Equivalent 4 30 Equivalent 6 65 Equivalent Weight 80 lbs 80 lb...

Страница 3: ...less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS Plate include with boiler 4 INSPECTION The state or local gas inspector of the side wall horizontally vented...

Страница 4: ...amp Only approved CPVC can be inserted into the Ti400 exhaust connection Note a 4 long piece of 4 CPVC is provided with the Ti400 Check the flue outlet gasket for proper insertion and sealing prior to...

Страница 5: ...Snow allowance Example 12 19 31 Coupling and elbow to be against wall play is acceptable 18 Min The vertical portion of the exhaust termination does not require insulation if less than 5 feet in total...

Страница 6: ...rmissible to run vent pipe through an existing chimney as long as 1 The chimney is not being used by any other appliance 2 Flue gases don t enter the vacant chimney 3 Only Trinity certified venting ma...

Страница 7: ...exhaust piping must be on a slope back to the boiler a minimum of per linear foot of vent For applications where excessive condensation is possible per linear foot is recommended 9 Exhaust vent pipe...

Страница 8: ...nstalled with 105 equivalent feet of intake venting and 105 equivalent feet of exhaust venting IMPORTANT The length of one vent pipe intake or exhaust may not exceed the length of the other vent pipe...

Страница 9: ...condition as the unit will shut down and damage to the flame sensor and components can occur NEVER use copper steel or galvanized piping in the construction of the condensate system condensate is ver...

Страница 10: ...t two threads from the end Over doping or applying dope to the female end can result in a blocked gas line DO NOT TIGHTEN FITTINGS WITHOUT SUPPORTING THE GAS VALVE as damage to the valve or motor can...

Страница 11: ...be reduced until the CO is less than 140 PPM or the CO2 is reduced to 8 9 for LP Gas If the CO is over 140 PPM and the CO2 is less than 8 9 for LP Gas contact NTI for assistance CO At minimum fan spe...

Страница 12: ...t apply torque to the boiler fittings Hold the fitting when installing otherwise damage to the unit will occur 6 0 HEATING SYSTEM PIPING Caution This boiler is designed to operate in residential and c...

Страница 13: ...13 57 F PL 36 UP 26 99 0011 Notes Must use at least minimum pump size specified for Ti150 if installation requires the use of a flow switch The Taco 009 circulator will flow more through the Ti100 15...

Страница 14: ...between the LWCO and the boiler Use the normally open contacts of the LWCO to break line voltage before being supplied to the boiler Circuit is 120 Volts 12 Amps Contact NTI for proper installation an...

Страница 15: ...ASME N O F Relief valve location All other piping is same as Ti150 Quantity and location of shutoff valves and drains are at the discretion of the installer Primary Loop For Heating Model Quantity and...

Страница 16: ...ltiple Zones using Zone Valves 6 2 2 Multiple Zones using Pumps Primary Loop Max 12 apart See figure 7 2 1 Multiple 4 wire Zone Valves for wiring 7 2 2 Multiple Zones with Taco Valve controller See fi...

Страница 17: ...ements Boiler sensor 2 Lo Temp Boiler sensor 1 Hi Temp Mix sensor 1 Hi Temp Mix sensor 2 Lo Temp See figure 7 2 3 Multiple Zones using pumps and pump controller By setting the tempering valves to diff...

Страница 18: ...The boiler is immediately energized if not already on the 3 way diverting valve moves to the domestic hot water position A and the circulator is energized Hot water is circulated through the plate hea...

Страница 19: ...the responsibility of NY Thermal Inc and suitable steps shall be taken to avoid it Cleaning Secespol brazed plate heat exchangers operate with high turbulence flow even at low flow rates This high tu...

Страница 20: ...t off valve fully 2 Turn the dial on the mixing valve to the desired setting being careful not to exceed 120 F or a dial setting greater then 2 and adjust LO setting accordingly 3 Create the maximum a...

Страница 21: ...inuity check between all wires and ground to make sure that there are no electrical leaks that could damage the board Before providing 120 Volts to the boiler do a polarity check of the line and neutr...

Страница 22: ...ostat closes circuit to zone valve motor thus opening the valve When the valve is opened the end switch closes the circuit between terminals T C on the Sentry control The Sentry 2100 provides power to...

Страница 23: ...es Operation Room thermostat closes circuit to TT terminals Taco ZVC403 to ZVC 406 zone controller The controller energizes the appropriate zone valve and closes the circuit between terminals T C on t...

Страница 24: ...e pump controller The controller energizes the appropriate circulating pump and closes the circuit between terminals T C on the Sentry control The Sentry 2100 provides power to the primary pump C1 onc...

Страница 25: ...to the injection pump through the 356 Tekmar controller 3 Closes the circuit between terminals T C on the Sentry control The Sentry 2100 provides power to the primary pump via C1 once the pump is on...

Страница 26: ...the Sentry 2100 detects the presence of the outdoor sensor the controller will operate in Reset Mode If the outdoor sensor is not installed the controller will operate in Conventional Mode If outdoor...

Страница 27: ...ntrol Function and To enter the programming mode press the function key once To scroll through the various menu options depress until the menu is displayed To alter the value press Function once and t...

Страница 28: ...comes 70 when it is 70 F outdoors or higher Only used if outdoor sensor is connected 85 SFS 75 100 Starting Gas Input Value Settable from 45 90 on Ti400 models 80 for Ti100 200 50 for Ti400 HFS 100 24...

Страница 29: ...vent outlet or other sources of heat The outdoor sensor connects to the top of the boiler on terminals O and D terminals are located at the top of the left side panel on Ti400 models Formula Operatin...

Страница 30: ...a pilot It is equipped with an ignition device that automatically lights the burner Do not try to light the burner by hand B BEFORE OPERATING check all around the appliance area for gas Be sure to che...

Страница 31: ...outlet prior to the primary circulator ensure the boiler is plumbed in primary secondary fashion Replace water pressure switch if plumbing and pressure is correct and if it measures an open circuit 3...

Страница 32: ...d gas valve opens Check for proper line pressure at gas valve when it opens If boiler lights check for flame signal between FC1 And FC2 on Fenwal control If lower then 1 2 DC Amps see Boiler will not...

Страница 33: ...issue If gas valve is not held when the gas nipple is connected the force of tightening the fitting can damage the valve and warp the fan housing If pipe is used the gas line must not create any force...

Страница 34: ...ter Energizes Indirect Pump Ap turns off C1 Combi Model Sentry 2100 Call for Ignition Air Switches Sentry 2100 Open Error A S C Closed Sentry 2100 Fan to SFS 75 24 Vlot signal to blower Sentry 2100 Er...

Страница 35: ...35 12 0 WIRING SCHEMATIC...

Страница 36: ...ng 14 0 ANNUAL MAINTENANCE AND INSPECTION This unit requires very little maintenance however a Qualified Technician should inspect it at the beginning of every heating season Inspection Check list 1 L...

Страница 37: ...Drain 18A 82913 Siphon Condensate Trap 19 82767 Cast aluminum Burner door 19A 82769 Ti Ceramic burner door disc 19B 82770 Ti Burner door gasket 20 82768 Ti Igniter gasket 21 82228 Tempering valve AM1...

Страница 38: ...ensate Tee 3 4 HB to 3 4 17A 83038 Adapter 3 4 x 1 4 18 82913 SIPHON CONDENSATE TRAP 19A 82769 Burner Door Ceramic Disc 19B 82770 Burner Door Viton Gasket 20 82768 Igniter Gasket Ti Series 21 83034 Ex...

Отзывы: