background image

#84034 - 

Trinity Lx Commercial Controller Replacement Instructions 

 

3/3 

 

S:\NTI2001_N_Drive (1-20-09)\R&D\PARTS - ENGINEERING\Parts Department Stickers and Instructions\Current Parts Instructions (doc)\84034 instructions - 
Trinity Lx Commercial Controller.doc 

3)

 

Pulses Per Revolution Adjustment

 – Since the replacement control is generic to all Lx Commercial boiler models, 

the  blower tachometer feedback “Pulses per revolution” setting  must be set to the appropriate value for the specific 
boiler. Select “Fan Configuration” from the “Configuration” menu and adjust the settings according to the following 
table (see the illustration below): 

 

Parameter 

Description 

Settings 

Pulses per revolution 

Number  of  feedback  pulses  produced  for  each  revolution  of  the 
combustion blower impeller. 

Lx500 = 2 
Lx600 = 3 
Lx700 = 3 
Lx800 = 3 

 

 

 

 
 

Отзывы: