Trinity
│
Installation and Operation Instructions
Tx Series
46
F
igure 10-5 Tx151C Primary-Secondary Plumbing (Combi)
(Single System Circulator Configuration)
Pressure Gauge
Primary Loop
(factory supplied)
Figure illustrates the basic
plumbing requirements for
a Tx151C (Combi) boiler installation with a single
Central Heating circulator. Refer to Figures 10-1(c)
and 10-1(d) for boiler fitting identification.