Wait 1 minute for the boiler to stabilize 

before carrying out the combustion 

analyses. Read the 

CO

2

 value (%) and 

compare it with the values given in the 

table below:

Gas

CO

2

 (%) 

CO

(ppm)

NG

8.

7

 

 10

.0

<

175

LP

9.

7

 

 11

.0

<

175

Table 3  

– 

 CO

2

 

M

ax

 – M

in

ATTENTION: 

The 

CO

2

 

at Min Power must be 

set 

low

er 

than the 

CO

2

 

at Max Power by 0.2 –

 1.0%

 

(

e.g. if, using LP, the CO

2

 at Max Power = 10.3%, 

the CO

2

 at Min Power must be between 9.5 – 10.1%).

ATTENTION!! Values must be obtained 

with the front cover installed.

If the

 CO

2

values given in 

Ta

ble

 3

, adjust the gas 

valve following the instructions below. 

Otherwise move directly to 

the 

next 

operation.

 

ATTENTION!!

 

Test Function will automatically deactivate 

after  30  minutes.  Test  Function  can  be 

RESET 

button.

1

3

2

4

Adjusting the Gas Valve at Max

 

 

Power

Adjust the gas valve by turning

 

setting 

screw 

4

 clockwise to increase the 

CO

2

 level;  counterclockwise  to  reduce 

the 

CO

2

 level (1 turn adjusts the 

CO

2

 level 

by  approximately  0.3%).  Wait  1  minute 

after each change in setting for the 

CO

2

 

value to stabilize.

 

If the measured

value corresponds 

Figure

 7  – Max Power

CO

2

 

Adjustment

Wait 1 minute for the boiler to stabilize 

before carrying out the combustion analyses.

2. 

Checking/

Adjusting the 

CO

2

 at Max

 Power

 

Set the thermostat at the highest possible 

setting to create a demand for heat. 

Select  Max  Power  from  the  Test  Mode 

–  Burner  Test  screen,  then  wait  for  the 

Burner Power gauge to reach 100%.

3. Checking/Adjusting the 

CO2

 at Min

 Power

Select  Min  Power  from  the  Test  Mode  – 

Burner  Test  screen,  then  wai

t

  for  the  Burner 

Power gauge to reach 10%.

4

to the value given

in Table 3, Max 

Power adjustment

is complete.

Otherwise, continue 

with the procedure.

Pa

rt

 3.  

Checking/Adjusting the 

CO

2

 at Max

 

and Min Power

Max Power

(100%)

Min Power

(10%)

8.

5

 

 

9.8

9.

5

 

 1

0.8

Содержание TFTN

Страница 1: ...on of carbon monoxide may result causing property damage personal responsible for the proper installation of this kit THE INSTALLATION IS NOT PROPER AND COMPLETE UNTIL THE OPERATION OF THE CONVERTED A...

Страница 2: ...150 and 199 Kit Contents Natural to LP Conversion Instructions nr 1 LP Conversion Label nr 1 LP Mixer w Diaphragm Table 1 nr 1 Gasket for gas pipe nr 2 Model Polidoro code MIXER data plate LP diaphrag...

Страница 3: ...result in dangerous explosion leading to property damage personal injury or death ATTENTION LIQUEFIED PETROLEUM LP PROPANE propane gas is heavier than air therefore it is imperative that your boiler i...

Страница 4: ...e g Remove the three bolts securing the NG mixer to the blower and remove the NG Mixer i Reassemble the gas pipe to the gas valve and mixer ATTENTION Use the new rubber gaskets provided with the kit j...

Страница 5: ...r clockwise 2 turns c Turn the gas supply on and test for gas leaks in all piping d Perform gas line pressure test and combustion calibration in accordance with Parts 2 and 3 NOTICE 199 Model ONLY Fig...

Страница 6: ...setting and continue with the Gas Valve and Burner Setup procedure outlined below Failure to perform the Gas Valve and Burner Setup correctly may result in incorrect operation component failure prope...

Страница 7: ...ilure to do so could result in serious personal injury or death Figure 6 Combustion Test Port Adjustments to the Gas valve may technician while using a calibrated combustion analyzer capable of measur...

Страница 8: ...valve by turning setting screw 4 clockwise to increase the CO2 level counterclockwise to reduce the CO2 level 1 turn adjusts the CO2 level by approximately 0 3 Wait 1 minute after each change in setti...

Страница 9: ...corresponds to the value given in Table 3 Min Power adjustment is complete Otherwise continue with the procedure Attention If Screw 2 has been adjusted it is necessary to repeat the Ajusting the CO2...

Страница 10: ...essure Pression d admission Natural Naturel Propane 10 5 wc 2 6 kPa 3 5 wc 1 kPa 0 wc 0 kPa 0 wc 0 kPa 8 wc 2 kPa 13 wc 3 2 kPa October 22 2018 b Conversion Decal Fill out the required information on...

Страница 11: ...11...

Страница 12: ...NTI Boilers Inc 30 Stonegate Drive Saint John NB E2H 0A4 Canada Technical Assistance 1 800 688 2575 Website www ntiboilers com Fax 1 506 432 1135 Visit us online 86662 Rev 22 7 13...

Отзывы: