Trinity
│
Installation and Operation Instructions
Tft Series
38
Near Boiler Piping (Tft155-250)
Figure 10-2(a)
Figure 10-2(b)
Supply/Return Bottom (Tft155-250)
Supply/Return Top (Tft155-250)
Figure 10-2(c)
Figure 10-2(d)
Supply Top / Return Bottom (Tft155-250)
Supply Bottom / Return Top (Tft155-250)
Auto Air-Vent
Pressure Relief
Valve
Pressure Relief
Valve
(alternate
location)
Pressure Gauge
Outlet
Inlet
Auto Air-Vent
Pressure Relief
Valve
Pressure Gauge
Pressure Relief
Valve
(alternate
location)
Outlet
Inlet
Auto Air-Vent
Pressure Relief Valve
Pressure Gauge
Pressure Relief
Valve
(alternate
location)
Inlet
Outlet
Auto Air-Vent
Pressure Relief Valve
(alternate location)
Pressure Gauge
Outlet
Inlet
Pressure Relief Valve