NTC VDR Series Скачать руководство пользователя страница 26

Reversible vibratory plates 

Operating instructions 

side 26 

edition 06/2009 

7. 

MAINTENANCE SCHEDULE 

 
The  Maintenance  Schedule  includes  only  the  most  important  operations.  Other  maintenance  operations  and  repairs  beyond  this  Schedule  should  be 
carried out depending on the operating conditions and according to the engine operating instructions.  CAUTION: Switch the engine off before any 
maintenance operation. Use the original spare parts only otherwise the vibration plate can be damaged and the respective complaint will not 
be recognized by the manufacturer. 

 

Maintenance Schedule for Engines HONDA GX 

Item 

Operation 

First Inspection 

After the first month or 

after the first 20 hours 

of operation 

Every 3 months or after 

every 50 hours of 

operation 

Every 6 months or 

after every 100 

hours of operation 

Engine Oil 

Oil level check 

 

DAILY 

Renewal 

 

 

 

 

Air Cleaner 

Check 

 

DAILY 

Cleaning 

 

 

 (1) 

 

Sparking Plug 

Check - cleaning 

 

 

 

 

Fuel Hose 

Check - replacement 

Every two years (2) 

Valve Clearance 

Check - adjustment 

Every year or every 250 hours of operation (2) 

Fuel Tank & Screen 

Cleaning 

Every year or every 300 hours of operation (2) 

Sedimentation Glass 

Cleaning 

 

 

 

 

Vibration Exciter 

Frequency adjustment 
Exchange of ooil 

Every year or every 300 hours of operation (2) 

Rubber Springs 

Check 

150 hours of operation 

Hydraulic Oil 

Inspection for tightness 

Every year or every 300 hours of operation (2) 

V-belt 

Inspection 

for 

tensioning, 

inspection of pulleys and clutch 

 

 

 

 (2) 

 
1) 

If the engine is operated in a dusty environment, the maintenance operations should be more frequent. 

2) 

These maintenance operations should be carried out by a NTC serviceman or by an authorized service centre depending on the engine 
type, especially if the user does not have sufficient knowledge or tools.  

 

Содержание VDR Series

Страница 1: ...MANUAL 2006 42 EC e mail ntc ntc cz sales ntc cz www ntc cz 06 2009 NTC STAVEBN TECHNIKA J S Czech Republic Tel 420 491 452 184 Fax 420 401 609 Reversible vibr tory plates VDR22 VDR26 26H VDR32 32H OP...

Страница 2: ...A net power 3 6 6 0 kW or diesel engine HATZ net power 3 6 kW V echna p slu n ustanoven kter v robek spl uje The product meets all relevent provisions Strojn za zen sm rnice 2006 42 ES NV 176 2008 Sb...

Страница 3: ...CIPLES 7 1 4 ENVIRONMENTAL PRINCIPLES 7 1 5 DISPOSAL OF THE MACHINE AFTER THE END OF ITS SERVICE LIFE 7 1 6 SAFETY INSTRUCTIONS FOR WORK WITH COMPACTING MACHINES 8 1 7 HYGIENIC INFORMATION 8 1 8 LIST...

Страница 4: ...lly obliged To designate the machine operator and to train him duly and properly To provide the operator with safe conditions for working with the machine To supervise the observance of the respective...

Страница 5: ...d be emptied CAUTION broken or leaking fuel tanks and fuel piping can cause explosion it is necessary to replace them without delay 9 The machine should not be operated everywhere where there is dange...

Страница 6: ...e machine is intended for To control the machine in a different way from that set forth in the Operating Instructions To operate the machine under influence of alcoholic beverages or drugs To operate...

Страница 7: ...Reversible vibratory plates Operating instructions side 7 edition 06 2009...

Страница 8: ...d of their service life they become dangerous waste materials Moreover the parts of the machine that come into contact with the above substances are also dangerous e g filters Please prevent these sub...

Страница 9: ...Information Noise Declared level of acoustic pressure A in workplace of the operator measured according to SN EN ISO 11201 by conditions determined in SN EN 500 4 Annex B VDR22 VDR26 VDR26H VDR32 VDR...

Страница 10: ...Instructions before work with the machine The NB 2 26 sign orders the operating staff operators to wear protective gloves when working with the machine to protect the hands from vibrations Warning si...

Страница 11: ...en the service intervals for cleaning or replacement of the air filter Clean the machine from dust regularly 2 TECHNICAL DESCRIPTION Our Reversing Vibration Plates are intended for the compacting of a...

Страница 12: ...mm 400 450 450 500 500 Vibratory Plate Lenght mm 630 700 700 750 750 Engine HONDA HONDA HATZ HONDA HATZ Model GX 160 GX 200 1B20 GX 200 1B20 Fuel Petrol Petrol Diesel Petrol Diesel Engine Output kW 3...

Страница 13: ...F 4 or API SG CE See recommendations of HONDA For HATZ engines it is recommended to use oils of persormance classification API CD CE CF CF 4 CG 4 For vibrators use brand name oils of viscosity class S...

Страница 14: ...temperature conditions at the workplace CAUTION Operating the engine with a low oil level may cause serious damage to the engine In case of any oil leakage stop the engine immediately and call an auth...

Страница 15: ...the filler and unscrew it again The oil level should be between the MIN and MAX marks at the disptick Should the oil level be below the MIN mark add recommended oil into the engine up to the upper mar...

Страница 16: ...may cause serious damage to the vibration exciter bearings 3 3 Checking the Fuel Level 1 In petrol engines use standard motor vehicle 90 octane petrol or higher If the fuel level is low refill it up t...

Страница 17: ...ing liberated and deposited in the machine fuel system Offer for Diesel oil at individual filling stations usually reflects the season of the year To add fuel lift the lock 1 first and then release th...

Страница 18: ...from inside Replace if too dirty Wash the foam collar in soap water never in any solvent Replace if damaged Replace all parts carefully Never operate the engine with the air filter removed Dust and di...

Страница 19: ...r In case of serious impurity replace the air filter element Re install all removed parts carefully Never operate the engine without the filter or with a damaged one Dirt and dust entering the engine...

Страница 20: ...dle run position 1 5 Pull the handle of the starting wire a little until you feel a resistance Then pull the wire swiftly Do not release the handle quickly but hold it by hand on its reverse movement...

Страница 21: ...ottle control lever see 4 2 1 into the idle run position a little bit above its extreme position 2 Pull the handle of the starting wire a little until you feel a resistance Then pull the wire swiftly...

Страница 22: ...and the machine will start travelling forward 6 Pull the travel control lever backwards to make the machine travel backwards 5 STOPPING THE MACHINE 5 1 HONDA Petrol Engines 1 Put the throttle control...

Страница 23: ...Reversible vibratory plates Operating instructions side 23 edition 06 2009 2 Set the ignition switch to OFF 1 3 Set the fuel valve 1 to OFF 1 1 1...

Страница 24: ...tions side 24 edition 06 2009 5 2 HATZ Diesel Engines 1 Put the throttle control lever 1 into the 0 position idle run The centrifugal clutch declutches and the engine stops vibrating 2 Push red button...

Страница 25: ...the engine speed After any possible repair or replacement of the HONDA GX engine the speed of the engine has to be set see the Maintenance Schedule Box 7 Vibration Exciter The speed of the HONDA iGX...

Страница 26: ...er every 100 hours of operation Engine Oil Oil level check DAILY Renewal Air Cleaner Check DAILY Cleaning 1 Sparking Plug Check cleaning Fuel Hose Check replacement Every two years 2 Valve Clearance C...

Страница 27: ...Fuel Hose Check replacement Every two years Valve Clearance Check adjustment Vibrator Exciter Frequency adjustment Exchange of oil Every year or 300 hours of operation 2 Rubber Springs Check 150 Hydra...

Страница 28: ...et the serviceman know it is a warranty case 4 Warranty claim needs to be done in written form best if Warranty claim form is used 5 Every warranty claim will be checked by authorized staff immediatel...

Страница 29: ...dealer Dealer Machine owner adress phone no contact person Machine operation site if different from owner s address Please send properly filled protocol by fax e mail or post to above mentioned addre...

Страница 30: ...Used spare parts Part no Description Pcs Tech director sign Production director sign Finishing warranty management to be filled by warranty dept of NTC Returning the machine to owner in case of repai...

Страница 31: ...8 30 18 30 09 00 16 00 10 00 16 00 38 044 360 46 77 38 066 77 395 77 38 097 77 236 77 38 093 360 46 77 https storgom ua product vibroplita ntc vdr32 html https storgom ua vibroplity html Powered by TC...

Отзывы: