![NTC VDR Series Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/ntc/vdr-series/vdr-series_operating-instructions-manual_1714920026.webp)
Reversible vibratory plates
Operating instructions
side 26
edition 06/2009
7.
MAINTENANCE SCHEDULE
The Maintenance Schedule includes only the most important operations. Other maintenance operations and repairs beyond this Schedule should be
carried out depending on the operating conditions and according to the engine operating instructions. CAUTION: Switch the engine off before any
maintenance operation. Use the original spare parts only otherwise the vibration plate can be damaged and the respective complaint will not
be recognized by the manufacturer.
Maintenance Schedule for Engines HONDA GX
Item
Operation
First Inspection
After the first month or
after the first 20 hours
of operation
Every 3 months or after
every 50 hours of
operation
Every 6 months or
after every 100
hours of operation
Engine Oil
Oil level check
DAILY
Renewal
Air Cleaner
Check
DAILY
Cleaning
(1)
Sparking Plug
Check - cleaning
Fuel Hose
Check - replacement
Every two years (2)
Valve Clearance
Check - adjustment
Every year or every 250 hours of operation (2)
Fuel Tank & Screen
Cleaning
Every year or every 300 hours of operation (2)
Sedimentation Glass
Cleaning
Vibration Exciter
Frequency adjustment
Exchange of ooil
Every year or every 300 hours of operation (2)
Rubber Springs
Check
150 hours of operation
Hydraulic Oil
Inspection for tightness
Every year or every 300 hours of operation (2)
V-belt
Inspection
for
tensioning,
inspection of pulleys and clutch
(2)
1)
If the engine is operated in a dusty environment, the maintenance operations should be more frequent.
2)
These maintenance operations should be carried out by a NTC serviceman or by an authorized service centre depending on the engine
type, especially if the user does not have sufficient knowledge or tools.