NTC RZ113 Скачать руководство пользователя страница 1

 
 
 
 

 

OPERATION MANUAL 

ASPHALT AND CONCRETE CUTTERS 

 

RZ113,   

RZ123 

 (version 01/2017) 

 

 

 

NTC STAVEBNÍ TECHNIKA spol. s r.o.

 

Jiřinková 120, 552 03 Česká Skalice 
Czech Republic 
Tel.: +420 491 452 184 

 

fax: +420 491 401 609 

E-mail: [email protected] 

 

www.ntc.cz

 

 

Содержание RZ113

Страница 1: ...ANUAL ASPHALT AND CONCRETE CUTTERS RZ113 RZ123 version 01 2017 NTC STAVEBN TECHNIKA spol s r o Ji inkov 120 552 03 esk Skalice Czech Republic Tel 420 491 452 184 fax 420 491 401 609 E mail ntc ntc cz...

Страница 2: ...tc The machine is driven with four stroke single cylinder engine HONDA net power GX160 3 6kW GX200 4 1kW V echna p slu n ustanoven Strojn za zen sm rnice 2006 42 ES NV 176 2008 Sb kter v robek spl uje...

Страница 3: ...etherlands Italy Hungary Romania and Russia NTC has certified quality control system according to ISO 9001 2008 All manufactured models undergo testing measuring and consideration of safety risks all...

Страница 4: ...6 4 4 1 Manual Handling 16 4 4 2 Handling by Crane 16 4 4 3 Handling by Forklift 16 4 4 4 Transport 16 4 4 5 Storing 16 4 5 SPECIAL CONDITIONS OF OPERATION 16 4 5 1 Work at Low Temperatures 16 4 5 2 W...

Страница 5: ...rrange his training ensure safe working conditions inspect attendance of the safety regulations inspect that the operator works with the machine in accordance with the Operation Manual ensure regular...

Страница 6: ...caused with contact with an obstacle 14 Do not smoke do not use naked flame Do not work close to flammables or in explosion danger areas 15 Avoid touching hot parts The exhaust silencer and other par...

Страница 7: ...when refueling 1 3 Hygienic principles Oil derivates fuel lubricants as well as paints and thinners are harmful agents Anyone who gets into contact with such agents is obliged to protect himself and f...

Страница 8: ...A G dB As measured by NV no 9 2002 Coll Annex no 3 section B paragraph 31 respectively in accordance with Directive 2000 14 EC Annex III Part B item 30 and EN ISO 3744 2010 107 4 105 4 Acceleration tr...

Страница 9: ...tion Symbol no 7 28 orders the operator to read the manual prior to starting the operation Safety mark symbol no NB 2 26 orders the operator to use protective gloves during the operation to reduce vib...

Страница 10: ...ECHNICAL DESCRIPTION The asphalt and concrete cutters RZ are intended for cutting of asphalt and concrete floors or road layers when repairing roads industrial areas etc The machine is based on a rigi...

Страница 11: ...M 3600 3600 Oil sensor yes yes Fuel consumption ltr hr 1 4 1 7 Engine output is mentioned according to SAE 1349 Actual output of the engine installed in the machine can be different with regard to var...

Страница 12: ...e matrix arm guidance are glued Screws at the pulleys the drive chassis are tight and prescribed the query moment We therefore recommend against any potential activity associated with permitting and t...

Страница 13: ...er 91 or more Top up fuel as necessary Never use dirty fuel or mixture with oil Avoid water and dust from entering the fuel tank 3 4 Check Air Filter Check the air filter for cleanness on a daily basi...

Страница 14: ...sition DANGER The spindle and the cutting disc begins to rotate immediately Be sure that the revolving disc would not cause any danger for the bystanders Have the disc cover closed before starting 4 2...

Страница 15: ...case the direction must be changed raise the disc from the cut take new direction and lower the disc again 7 At the end of the cut raise the disc set the throttle to idle NOTE The cutting disc should...

Страница 16: ...sition If overturning happens see point 3 5 4 4 5 Storing Store the machine on a safe place secured from theft and misuse We recommend an indoor dry place without excessive concentration of chemical a...

Страница 17: ...mation to an authorized service center or manufacturer 5 1 Maintenance of the Engine see enclosed Engine Operation Manual 5 2 Tensioning of the Drive Belts check regularly tensioning of the drive belt...

Страница 18: ...on Initial inspection After 1st month or 20 hrs Every 3 months or 50 hrs Every 6 months or 100 hrs Engine oil Inspection of oil level DAILY Exchange Air filter Inspection Cleaning 1 Spark plug gasolin...

Страница 19: ...e machine is in warranty write date of purchase and let the serviceman know it is a warranty case 4 Warranty claim needs to be done in written form best if Warranty claim form is used 5 Every warranty...

Страница 20: ...ne sale date Machine purchased from NTC dealer Dealer Machine owner adress phone no contact person Machine operation site if different from owner s address Please send properly filled protocol by fax...

Страница 21: ...Warranty claim assessment YES NO Reason Used spare parts Part no Description Pcs Tech director sign Production director sign Finishing warranty management to be filled by warranty dept of NTC Returnin...

Страница 22: ...Asphalt and concrete cutters Operation manual Page 22 issued 01 2017...

Отзывы: