background image

 

  NRD USA

 / 2937 Alt Boulevard / PO Box 310 / Grand Island, NY 14072-0310 

  PHONE

 716 773 7634 / 

FAX

 716 773 7744 / 

EMAIL

 [email protected] / 

WEB

 

www.nrdllc.com

 

  NRD Asia Pte. Ltd

 / 114 Lavender Street #08‐90 CT Hub 2 Singapore 338729 

  PHONE

 +65 6679 1707 / 

EMAIL

 [email protected] / 

WEB 

www.nrdllc.com

 

- 4 - 

Alphaboost_Manual-1/19 

Installation 

Installation of the Alphaboost™ Ionization System involves mounting and wiring the components in an arrangement 
that satisfies the environment and power requirements of your application.  Procedures may vary according to your 
applications need.  The Alphaboost™ Ionization System is intended to be used in an Analytical Balance application.  
In such an application, the ionizer can easily provide enough output to discharge samples placed on the analytical 
balance weighing pan.  The Alphaboost™ controller is to be placed near the Analytical Balance(s) in a convenient 
and visible position. 
Note: the Alphaboost™ Ionization System is not to be connected to a power source while being installed or 
serviced. 

 
AB-ABH Ionizing Head Installation 

1.

 

Apply double sided tape to metal electrode on the AB-ABH ionizing head. 

2.

 

Attach the AB-ABH ionizing head to the outside of top panel of the Analytical Balance Draft Chamber. 
Center metal electrode, as close as possible, over the weighing pan. 

3.

 

Attach BF3 EZ Mount to inside of top panel of the Analytical Balance. Center under metal electrode on 
AB-ABH ionizing head. 

                               

 

 
 

2U500 Staticmaster

®

 Installation 

The 2U500 Staticmaster slides into the BF3 EZ Mount that is attached inside the Analytical Balance. 

 

AB-TC Controller Installation 

1.

 

Locate the AB-TC Controller in a accessible and visible position that is within reach of the two (2) meter 
cable of the AB-ABH Ionizing Head. 

2.

 

Connect the AB-ABH Ionizing Head cable to the Boost Output connection on back of the AB-TC 
Controller. If connecting multiple AB-ABH Ionizing Heads, use AB-SPL Splitter. A maximum of four (4) 
AB-ABH Ionizing Heads can be connected to one (1) AB-TC Controller. 

3.

 

Connect the AB-TC Controller to a proper ground using ground connector on back of the controller. 
Without being connected to a proper ground, the AlphaBoost will exhibit an uncontrolled offset. 

4.

 

Connect the supplied 24V power supply to the power input on back of the AB-TC Controller. The AB-TC 
Controller requires 24V @ <200mA to operate. 

 
 
 

Operation 

Follow the steps below to correctly power the Alphaboost™ System. 

Analytical Balance

top panel

Metal

Electrode

BF3 EZ Mount

(included)

2U500 
Staticmaster 
(sold separately) 

Double sided 
tape 

AB-ABH

Ionizing Head

AB-ABH 
Ionizing Head 

Содержание Alphaboost AB-TC-1

Страница 1: ...on Maintenance Staticmaster Alphaboost Model AB TC 1 AB TC 1B Contents Alphaboost System General Description Page 2 Model AB TC Control System Page 2 Model AB ABH Ionizing Head Page 3 Model 2U500 Staticmaster Ionizer Page 3 Model AB TC 1B Alphie Page 3 Installation Page 4 AB ABH Ionizing Head Installation Page 3 2U500 Staticmaster Installation Page 4 AB TC Controller Installation Page 4 Operation ...

Страница 2: ...ntroller The AB TC controller see figure below is used to create the waveform to drive the ions away from the ionizing head It is factory preset for ON time for each polarity of the Boost Voltage The amplitude of the ionizer Boost Voltage The Duty Cycle of the Boost Waveform The controller includes a readout of the duty cycle Balance setting of the controller with a resolution of 1 While the setti...

Страница 3: ...put of the AB TC Controller connects up to 4 ionizing heads when using the Splitter model AB SPL sold separately AB ABH Ionizing Head AB SPL 1 to 4 Splitter Model 2U500 Staticmaster Ionizer The model 2U500 Staticmaster is a small self powered ion producing device which contains 500 µCi of 210Po All NRD ion sources are encapsulated in precious metals by means of a special patented process This resu...

Страница 4: ...op panel of the Analytical Balance Draft Chamber Center metal electrode as close as possible over the weighing pan 3 Attach BF3 EZ Mount to inside of top panel of the Analytical Balance Center under metal electrode on AB ABH ionizing head 2U500 Staticmaster Installation The 2U500 Staticmaster slides into the BF3 EZ Mount that is attached inside the Analytical Balance AB TC Controller Installation ...

Страница 5: ... will come to the operator by touching the contact The voltage source on the board is much lower impedance and as such contact with high voltage section of the circuit board would be painful This instrument uses high voltages that can cause personal injury Before servicing shut down the instrument and disconnect the instrument from line power It is recommended that the AB TC Controller not be open...

Страница 6: ...etion of NRD free of charge Any device under warranty should be shipped prepaid to the NRD factory Call Customer Service at 716 773 7634 for a Return Authorization number and shipping instructions Include a copy of your original packing slip invoice or other proof of purchase date If the device is out of warranty NRD LLC will quote repair charges necessary to bring your device up to factory standa...

Отзывы: