- 31 -
REASSEMBLY PROCEDURE
6. Install the five rubber or aluminum
plugs (GM) into the main body (A).
Line the dowel pin (K) up with the main
body (A) and slide it into place.
7. Install the head (ph7) onto the main
body (A).
NOTE:
There will be a gap
in between the head and the main
body.
8. Install the 4 washers (U). Apply anti-
seize on top nuts. Install and torque
the top nuts (R). (Torque hammer,
model specific.)
HAMMER
MODEL
TOP NUTS
ft lbs
(Nm)
NPH-3500
400
(550)
NPH-4500L
700
(950)
9. Install the 2 plates (s8).
Note:
Top nuts (R) must have the proper orientation for the 2 plates to fit properly.
Always tighten after torque when aligning.
DO NOT
loosen.
10. Continue to install the 4 collars (AT), 4 washers (U1), and 4 cotter pins (ph6).
After installed, proceed to stake the cotter pins (ph6) to secure them.
Содержание NPH-3500
Страница 10: ... 9 HAMMER SERIAL NUMBER LOCATION SERIAL NUMBER LOCATION sn1 ...
Страница 19: ... 18 OPERATION OPERATING PROCEDURE DO NOT USE THE HAMMER AS A HOIST ...
Страница 37: ... 36 WARRANTY STATEMENTS ...
Страница 38: ... 37 WARRANTY STATEMENTS ...
Страница 39: ... 38 WARRANTY STATEMENTS ...