NPK
- 58 -
GAS CHARGE
CHECKING THE GAS PRESSURE
Inspect the nitrogen gas pressure every 100 hours.
PROCEDURE
1. The gas pre-charge is measured with
no
preload
on the tool (HH). Remove the
tool or position the hammer (KK) with the
tool fully extended.
2. Remove the charge valve cap (M1) from
the hammer charge valve (M).
Do not
remove the charge valve assembly!
3. Turn the NPK charge adapter T-handle
(g2) to a full counterclockwise position.
4. Install the NPK charge adapter (g1) onto
the hammer charge valve located on the
hammer gas head (L).
5. Tighten the charge adapter cap (g6).
Содержание GH10
Страница 66: ...NPK 65 WARRANTY STATEMENTS ...
Страница 67: ...NPK 66 WARRANTY STATEMENTS ...
Страница 68: ...NPK 67 WARRANTY STATEMENTS ...
Страница 69: ...NPK 68 WARRANTY STATEMENTS ...
Страница 71: ... Copyright 2014 NPK Construction Equipment Inc www npkce com H050 9630G GH7 GH50 Hyd Ham Operators Manual 4 14 ...