NPK
- 20 -
LUBRICATION
AUTOLUBE GREASE LINE PRE-FILLING
8. Pump grease through the grease line
(
29
) until a steady stream of grease (
28
)
is realized at the opposite (hammer) end.
9. Re-attach the grease line (
29
) to the
hammer (KK).
10. Pump twenty more shots of grease into
the grease line (
29
). This will prime the
hammer cavity and pre-lube the tool.
Look for grease coming out around the
tool (HH) at the tool bushing (see
arrow).
11. Remove the hose fill adapter (a13) and
re-connect the grease line (
29
) to the
Autolube pump (FZ).
NOTE: If the Autolube has run out of grease, the above procedure should be
used to purge all the air out of the line before using the hammer. Failure
to do this will result in an intermittent supply of grease to the hammer.
Содержание GH10
Страница 66: ...NPK 65 WARRANTY STATEMENTS ...
Страница 67: ...NPK 66 WARRANTY STATEMENTS ...
Страница 68: ...NPK 67 WARRANTY STATEMENTS ...
Страница 69: ...NPK 68 WARRANTY STATEMENTS ...
Страница 71: ... Copyright 2014 NPK Construction Equipment Inc www npkce com H050 9630G GH7 GH50 Hyd Ham Operators Manual 4 14 ...