Table 2.8
– Characteristics of UBZ inputs designed to connect CT
Current of UBZ inputs
designed for
measurement of CT
output currents, A
Ratio of overload relative
to rated current (5A)
Maximum duration of
current action, s
Minimum delay before
restarting, s
0
– 12
2,4
continuously
-
12
– 15
3
60
10
16
– 20
4
30
15
21
– 25
5
15
30
ATTENTION: MAXIMUM CURRENT OF UBZ INPUTS DESIGNED FOR MEASUREMENT OF CT OUTPUT
CURRENTS IS 25 A.
Rated input current of CT should be within the range: In<Ict<3*In.
It is recommended to use CT with Ict=2*In.
3 UBZ DESIGN
UBZ is microprocessor-based digital device that provides a high degree of reliability and accuracy.
Operational power is not required. The controlled voltage is simultaneously the power supply voltage.
4 SAFETY PRECAUTIONS
During operation and maintenance it is necessary to comply with the requirements of regulatory
documents:
Regulations for Operation of Consumer Electrical Installations;
Safety Rules for Operation of Customer Electrical Installations;
Occupational Health and Safety during Electrical Installations Operation;
TO ENSURE SAFE OPERATION OF THE PRODUCT IT IS STRICTLY FORBIDDEN:
–
TO CARRY OUT INSTALLATION WORKS AND MAINTENANCE
WITHOUT SWITCHING THE UNIT
OF POWER SUPPLY;
–
TO OPEN AND REPAIR THE UNIT INDEPENDENTLY;
–
TO OPERATE THE UNIT WITH MECHANICAL DAMAGES OF THE HOUSING;
–
TO PENETRATE MOISTURE ON CONTACTS OF TERMINAL BLOCKS AND THE INTERNAL
ELEMENTS OF THE UNIT.
5 INTENDED USE
5.1 SAFETY PRECAUTIONS
TO ENSURE SAFE OPERATION OF THE PRODUCT IT IS STRICTLY FORBIDDEN:
–
TO CARRY OUT INSTALLATION WORKS WITHOUT SWITCHING THE UNIT OF POWER SUPPLY;
–
TO OPERATE THE UNIT WITH MECHANICAL DAMAGES OF THE HOUSING;
–
TO PENETRATE MOISTURE ON CONTACTS OF TERMINAL BLOCKS AND THE INTERNAL
ELEMENTS OF THE UNIT.
5.2 UBZ Preparation for Use
ATTENTION: To improve performance properties of UBZ, it is recommended to install fuses (fusible
elements or their analogues) in the following circuits (listed in the order required; a hyphen is the
recommended fuse value):
1) UBZ power supply circuits (27, 28, 30
– L1, L2, L3) – 1 A;
2) circuits for measurement of temperature, current, voltage (39, 40, 44, 45, 48-52)
– 0.5 A;
3) RS-485 (33 - 35)
– 0.5 A;
4) relay output contacts (the fuse rating is selected according to the connected circuits, but it should not
exceed for contacts 1-3
– 15 A, for contacts 4-9 – 5 A).
5.2.1
Connect the current transformers in accordance with Fig.5.2;
5.2.2
Pass through a differential current transformer (zero sequence transformer) all three phase wires and
connect it to UBZ;
5.2.3
To monitor and measure the motor insulation, connect the control terminal of the insulation
25