10.0 MAINTENANCE AND INSPECTION SCHEDULE 

 

It is recommended that maintenance and inspection is done on a scheduled basis. Maintenance 
requirements will naturally vary widely for each installation and specific operating conditions. It is 
suggested that a complete inspection be performed with the necessary maintenance at the end of the 
first day, the first week, the first month and the first 3 months. These inspections will be indicative of 
how often future maintenance will be necessary. 
 

 

 

 

 

 

   

EVERY WEEK 

Inspect the Filter cartridge. Clean or replace as required. Remove any fines collected from the catch 
pan. This time interval should be shortened if experience indicates unusual dust loading. 

 Check the system for air leaks and correct as required. 

 

 

 

 

 

 

EVERY MONTH 

I

nspect the vacuum breaker valve filter/silencer. Clean or replace as required. 

 

 

 

 

 

         

EVERY 3 MONTHS 

Units equipped with permanently lubricated motor bearings do not need lubrication. All motors should 
be examined on an individual basis. 
 

Units equipped with ball bearing motors are factory greased and should be re-lubricated with a high-
grade ball bearing grease rated for temperature and duty cycle required. 

 

WHEN ADDING LUBRICANT 

 

1. 

Remove filter plugs at the bearings and install grease fittings suitable to your grease gun. Also, 
remove the drain plugs at the bearings. 

2. 

Add ball bearing grease until all of the old grease is expelled through the drain hole. 

3. 

Run motor with drain plug removed to eliminate excess grease. 

4. 

Clean and replace drain plugs. 

5. 

Check motor (s) amperage (see Engineering Data Sheet). 

 

EVERY 6 MONTHS 

 

Check for loose electrical connections. Tighten all bolts and nuts. Check V belts. Adjust or replace as 
required.

 

 

 

 

Содержание VPD-25

Страница 1: ...11 Parts Email parts novatec com Toll Free 800 938 6682 Service service novatec com Main Fax 410 789 4638 Sales sales novatec com INSTRUCTION MANUAL Positive Displacement Vacuum Pump Model VPD 25 2018...

Страница 2: ...perly respond to any of your requests DISCLAIMER NOVATEC Inc shall not be liable for errors contained in this Instruction Manual nor for misinterpretation of information contained herein NOVATEC shall...

Страница 3: ...ODUCTION 4 2 0 WARNING 4 3 1 Seek Time 4 4 0 UNPACKING 5 5 0 GENERAL INSPECTION 5 6 0 MECHANICAL INSTALLATION 6 7 0 ELECTRICAL INSTALLATION 6 8 0 ENGINEERING DATA 6 Specifications 6 9 0 VPD 25 PARTS L...

Страница 4: ...l or More Atmospheric pressure is lower at higher elevations and as a result the compression of air by the pump requires more work for vacuum conveying In these higher altitude applications the pressu...

Страница 5: ...mage on delivery receipt and report immediately to trucking company 5 0 GENERAL INSPECTION When the unit is unpacked make a visual inspection looking for missing parts or damage that may have occurred...

Страница 6: ...mounted master control panel to the vacuum power unit as shown on the electrical wiring schematic for the master control panel Verify the correct rotation of the motor with the directional labels on...

Страница 7: ...t before ordering and installing replacement All information is subject to change without notice QTY DESCRIPTION Part Number 1 Blower GO PD 6MQ VERT BHRD 1 Motor 208 230 460 3 60 01918 1 Motor 575 3 6...

Страница 8: ...system for air leaks and correct as required EVERY MONTH Inspect the vacuum breaker valve filter silencer Clean or replace as required EVERY 3 MONTHS Units equipped with permanently lubricated motor...

Страница 9: ...il manufactured by Royal Purple that is called SYNFILM GT 220 The Novatec Part Number for this oil is 03 0991 and is available in quart containers If you choose to use another brand of oil be sure it...

Страница 10: ...Rights Reserved Page 10 Instruction Manual VPD 25 IM 12 FEB 2018 NOTE Novatec VPD Series pumps utilize Universal RAI DSL blower models with bearings enclosed in a lubricant bath eliminating the greas...

Страница 11: ...c Please note that we always strive to satisfy our customers in whatever manner is deemed most expedient to overcome any issues in connection with our equipment Warranty Periods Note All warranty peri...

Страница 12: ...d to ozone 2 NovaVac Dryer The ability of the canisters to hold vacuum will be compromised if the vacuum seal edge is damaged from mishandling We do not warranty canisters damaged from improper handli...

Отзывы: