4.0 UNPACKING
Caution should be exercised to see that the equipment is not handled roughly. The crate must be
removed carefully. The machine must not be used to pry against Do not pry against the machine when
removing the crate. The vacuum power unit is usually shipped completely assembled and requires no
further attention prior to installation. Note any shipping damage on delivery receipt and report
immediately to trucking company.
5.0 GENERAL INSPECTION
When the unit is unpacked, make a visual inspection looking for missing parts or damage that may
have occurred during shipment. Report any missing parts to Novatec immediately. All electrical and
mechanical connections should be checked for tightness, as vibration during transit may cause them
to loosen.
IMPORTANT:
Before placing the vacuum pump into service, be sure oil has been put in the pump, as
oil may have been drained following factory quality control testing. See page 9 for lubrication
guidelines.
NOTE: Replacement blowers are shipped without oil installed.