NOVARENT proceq Скачать руководство пользователя страница 3

This  Quick  Start  Guide  does  not replace  the Operating  Instructions 
of  this  product.  For  complete  instructions  and  safety  handling 
information, see the Operating Instructions:

 

 

Touchscreen Unit:

 

 

 

 

 

DVD

: Delivered with the product

 

 

Proceq Website: 

www.proceq.com

 

 

Downloads

 

 
 

Scope of Delivery

 

 

Profometer 600 (39210001)

 

 

Profometer 630 AI / 650 AI (39220001 / 39230001)

 

 

Profometer Corrosion (39250001)

 

 

Upgrade kit to Profometer Corrosion (39250002)

 

 

Upgrade kit to Profometer 600 Cover Meter (39250003)

 

 

Profometer Corrosion rod electrode (39250010)

 

 

Profometer Corrosion wheel electrode (33001001)

 

 

Profometer Corrosion four wheel 
electrode (33001004)

 

A

 

Carrying case

 

 

••••

 

 

 

 

 

 

 

 

Profometer touchscreen

 

 

 

•••

 

 

 

 

 

 

 

 

Battery complete

 

 

 

•••

 

 

 

 

 

 

 

 

Power supply incl. cables

 

 

 

•••

 

 

E

 

 

 

 

 

 

USB cable

 

 

 

•••

 

 

F

 

 

 

 

 

DVD with software and documentation

 

• •

 

•••

 

 

 

 

 

 

 

Documentation

 

• •

 

•••

 

 

 

 

 

 

 

 

Activation key

 

 

 

 

 

I

 

 

 

 

 

 

Carrying strap complete

 

 

 

•••

 

 

J

 

 

 

 

 

 

Probe cable 1.5 m (5 ft)

 

 

 

••

 

 

 

 

 

 

 

 

Universal probe with ruggedized scan cart

 

 

 

••

 

 

L

 

 

 

 

 

 

Chalk

 

 

 

• •

 

 

Interface box

 

 

• •

 

 

 

 

 

 

 

Cable coil l=25 m (82 ft) with clamp

 

 

• •

 

 

 

 

 

 

 

 

Rod electrode with spare parts

 

 

 

 

 

P

 

Copper sulphate, 250g

 

• • •

 

 

 

 

Q

 

Citric acid, 250g

 

• •

 

 

 

 

R

 

Electrode cable, 1 lead, l=1.5 m (5 ft)

 

 

 

 

 

S

 

Tool kit

 

• •

 

 

 

 

T

 

Wheel electrode with cables and spare parts

 

 

 

 

 

U

 

Four wheel electrode with cables and spare parts

 

 

 

 

 

  

Getting Started

 

  

Battery installation

 

 

To install the battery, remove the 
protection  foil  and  lift  the  stand 
as  shown.  Insert  the  battery  and 
fasten in place with the screw.

 

 

Load battery

 

The battery must be charged for 8 hours before first use. 
Connect  through  the  power  supply  connection.  A  Quick 
charger is also available (full charging < 5.5 h).

 

 

Probes connection

 

 

 
 



 



 

 

 

 

Profometer 6

 

 

 

Connect the universal probe to either of the two sockets

 

 

or 

 on the upper side of the Profometer touchscreen 

using the probe cable.

Profometer Corrosion

Mount  the  interface  box  on  the  right  side  of  the 
Profometer  touchscreen  using  the  attached  screws 

 

and 

 and connect the cable to either of the two sockets

 

or 

  on  the  upper  side  of  the  Profometer 

touchscreen. Connect the electrode signal cable to socket 

 and the ground cable to the socket 

 of the interface 

box.  Wheel  electrodes:  connect  the  path  measurement 
cable to socket 

 of the interface box.

 

 

Start the instrument and enter activation key

 

 

The  following  procedure  has  to  be  performed  at  start  up 
in  order  to  upgrade  to  Profometer  630  AI/650  AI 
functionalities  from  a  Profometer  600  unit  or  to  unlock 
Profometer 600/630 AI/650 AI Cover Meter functionalities 
on a Profometer Corrosion unit.

 

 

1.  Press the 

Power On/Off

 button to power on the 

touchscreen 

2.  Access the 

System

 menu, then go to 

Features

 and 

 

Enter activation key

 

 

 →

 

 

3.  Enter the 

activation key

 

 

It  is  then  recommended  to  check  for  firmware  updates 
before  using  the  instrument  for  the  first  time  (see  box 
“Profometer Link”).

 

 

  

Main menu

 

  

On  start  up,  the  main  menu  is  displayed.  All  functions 
are accessible directly via the touchscreen.

 

 

Return  to  the  previous  menu  by  pressing  the  back 
button  or  the  return  icon  (arrow)  at  the  top  left  of  the 
touchscreen.

 

 

Measurement

 

 

Select to access either Cover Meter or

 

 

Corrosion measuring modes.

 

 

Settings

 

 

Application specific settings 

– See Operating 

Instructions for details.

 

 

Explorer

 

 

File manager application for reviewing saved 
measurements.

 

 

System

 

 

Select your preferred interface language, date 

and time settings and power saving options.

 

 

Information

 

 

Refer to the complete Operating Instructions.

 

 

Also find important device information.

 

 

Power off

 

 

Switch off the device.

 

 

 

Profometer Link

 

 

Install  the 

Profometer  Link

  software  provided  on  the  DVD. 

Connect the instrument to a PC using the USB cable provided. 
Make sure you are connected to the Internet.

 

 

Click on the PQ-Upgrade icon to check for 
software updates.

 

 

 

Updates  should  be  performed  periodically  to  take 
advant

age of Proceq’s continuous firmware development.

 

 

 
 

E

n

g

lish

  

 

© 2018 Proceq SA

 

3

 

Содержание proceq

Страница 1: ...de Kurzanleitung Guide de Prise en Main Guida Breve Guía de Inicio Rápido Guia de Início Rápido Hızlı Başlangıç Kılavuzu Краткое руководство クイックスタートガイド 快速入门指南 빠른 시작 안내서 Design Patent Pending Swiss Solutions since 1954 ...

Страница 2: ...A B C D E F G H I J K L M Profometer 650 activation key 4526 5745 1654 N O P Q R S T U 2 2018 Proceq SA ...

Страница 3: ... touchscreen using the attached screws and and connect the cable to either of the two sockets or on the upper side of the Profometer touchscreen Connect the electrode signal cable to socket and the ground cable to the socket of the interface box Wheel electrodes connect the path measurement cable to socket of the interface box 2 Start the instrument and enter activation key The following procedure...

Страница 4: ... des Touchscreens montieren und Kabel an eine der beiden Buchsen oder auf der Oberseite des Touchscreens anschließen Elektrodensignalkabel an Buchse und Erdungskabel an Buchse der Schnittstellenbox anschließen Radelektroden Wegmess kabel an Buchse der Schnittstellenbox anschließen 2 Gerät einschalten und Aktivierungsschlüssel eingeben Um weitere Funktionen z B die des Profometer 630 AI 650 AI oder...

Страница 5: ...prises ou sur le côté supérieur du Touchscreen Profometer Branchez le câble de signal d électrode dans la prise et le câble de terre dans la prise du boîtier interface Électrodes à roue branchez le câble de mesure de déplacement dans la prise du boîtier interface 2 Démarrage de l instrument et saisie de la clé d activation Cette procédure doit être réalisée au démarrage afin de mettre à niveau ver...

Страница 6: ...do le viti in dotazione e quindi collegare il cavo a una delle due prese o sulla parte superiore del touchscreen Profometer Collegare il cavo segnale dell elettrodo alla presa e il cavo di terra alla presa del modulo di interfaccia Elettrodi a ruota collegare il cavo di misurazione del percorso alla presa del modulo di interfaccia 2 Avviare lo strumento e inserire il codice di attivazione Per aggi...

Страница 7: ...de los dos enchufes ó en el lado superior de la pantalla táctil Profometer usando el cable de sonda Conectar el cable de señal del electrodo en el enchufe y el cable de tierra en el enchufe de la caja de interfaz Electrodos de rueda conectar el cable de medición del desplazamiento en el enchufe de la caja de interfaz 2 Iniciar el instrumento y entrar la clave de activación El siguiente procedimien...

Страница 8: ...om tela touchscreen utilizando os parafusos fornecidos e e ligue o cabo em um dos conectores ou no lado superior do Profometer com tela touchscreen Conecte o cabo do sinal do eletrodo ao conector e o cabo terra da caixa de interface Eletrodos de roda conecte o cabo de medição de percurso ao conector da caixa de interface 2 Inicie o instrumento e introduza o código de ativação Proceda da seguinte f...

Страница 9: ......

Отзывы: