background image

LASER OPERATION

 

PAGE 

|

 11 

Control Port – Functionality  

The SMD24 can be operated directly via the Control port (see Fig 4-1) by applying 0 to 5 V, interlocks and push button in 

accordance with the diagrams in this section. 

9-way Function Table and Pin-Out Diagram 

 
 
 
 
 

Pin 

Function 

+5 V rail (source) 

Interlock (connection 2) and Enable LED anode 

Enable switch (connection 1) 

Diode current enable (connect to pin 1) 

Ground (GND) 

Interlock (connection 1) 

Enable LED cathode 

Enable switch (connection 2) 

Ground (GND) 

 
The remote Interlock, Enable and Enable LED can be wired in accordance with the diagrams below [Fig 5-1 & Fig 5-2], to be 

used as part of a laboratory interlock safety circuit. If either Interlock is broken the system will shut down, the Enable 

button must be pressed to restart the system. 
Connections to the control port shall be “potential free” i.e. isolated from mains voltage by a barrier rated at 3 KV (e.g. 

Double Insulation, Etc). 
The combined electrical resistance of the “Enable Switch”, “Interlock” and associated wiring shall be less than 5 ohms. 
If a solid-state device such as on opto-isolator is used as the switching element(s), the total combined voltage drop must 

not exceed 500 mV. 
The current through the “Interlock” and “Enable Switch” circuitry is less than 100 mA. The LED current source is 10 V via a 

540 R resistor.                                                 

 
 

 
 
 
 

 

              Figure 5-1                                Figure 5-2                                     Figure 5-3                             

The PSU has its own 5 V source (pin 1) which must be shorted to pin 4 to allow full Power Mode operation. Pin one must be 

linked to Pin 4. 

 

Содержание gem with smd12

Страница 1: ...ENGINEERED BY LASER QUANTUM gem with smd24 User Manual...

Страница 2: ...will provide initial assistance to rectify the problem remotely If this is not possible they will provide you with a Return Material Authorisation RMA Form and instruction on how to package and return...

Страница 3: ...erating Manual Opening the product or breaking the warranty seals Operation in any hostile environment as outlined in the Operating Manual Any damage due to operation in unclean environments Any subst...

Страница 4: ...ipment for measurement and laboratory use General requirements Directive 2014 30 EU Electromagnetic Compatibility EMC Directive EN 61326 1 2013 Electrical equipment for measurement control and laborat...

Страница 5: ...safe mode Electrical Specification Environment Optimal Operating Temperature Range Laser Head 22 C to 37 C Maximum Operating Temperature Laser Head 40 C Maximum Operating Temperature PSU 60 C For opt...

Страница 6: ...the following instructions to avoid eye damage and prevent the risk of fire Laser safety goggles must be worn at all times when the laser is in operation Always ensure the beam is safely collected in...

Страница 7: ...NOT interchangeable and must remain paired to meet specification Pairing with another Laser Quantum PSU should not be attempted as this may damage the laser Depending on the purchase specification so...

Страница 8: ...SYSTEM SPECIFICATIONS PAGE 8 Weights and Dimensions gem laser head Weight 0 75 kg smd24 PSU Weight 1 2 kg...

Страница 9: ...rawings Figure 4 1 Warning Serious Personal Injury The Gem laser contains components which can be damaged if exposed to an electro static discharge Ensure the connector pins on the back of the laser h...

Страница 10: ...aser may now start to emit laser light Power Mode The laser operates in Power mode The laser power is constant and a feedback control loop maintains the power at the level requested by the operator vi...

Страница 11: ...oratory interlock safety circuit If either Interlock is broken the system will shut down the Enable button must be pressed to restart the system Connections to the control port shall be potential free...

Страница 12: ...5 GND Ground Port settings are Baud Rate 57 600 Parity None Stop Bit 1 Hand Shaking None The operator must wait for a response from the PSU before sending the next command A response is any text strin...

Страница 13: ...l cable 3 m is used compliance of the system may be compromised unless optical isolation is used RemoteApp Using Laser Quantum s unique RemoteApp software suite the laser can be controlled via the RS2...

Страница 14: ...e g TEC forced air cooling water cooling For further information on heatsinking your laser system please consult your sales representative who may be able to provide a heatsink solution gem laser hea...

Страница 15: ...th the laser and do not attempt to control the laser with any other PSU Ensure laser is firmly fixed to an appropriate heatsink to allow efficient heat dissipation from the laser head and ensure a the...

Страница 16: ...accepts no liability for damage to persons or property caused by incorrect or unsafe use of any of its products this is the sole responsibility of the user Proper safety regulations for the use of the...

Страница 17: ...ered by Laser Quantum ARGES part of Novanta 125 Middlesex Turnpike Bedford MA 01730 USA Phone 1 781 266 5700 Email photonics novanta com Website https novantaphotonics com May 2022 2022 Novanta Corpor...

Отзывы: