Installation Procedure
Z-FLEX
16.
Enclose coaxial vertical pipes in any occupied areas above first floor, including closets
and storage spaces. The enclosure needs to support and maintain minimum
clearances to coaxial pipes/vent and may be framed and sheet rocked.
17.
Locate and mark center of coaxial pipe on roof.
18.
Review appliance manufacturer's installation instructions for clearances of vent to
combustible surfaces and cut appropriate sized hole in roof incorporating necessary
clearances.
ROOF TERMINATION SUPPORT
a.
Center roof support over hole in roof and secure to top of roof.
b.
Install 42" long rigid pipe included in vertical kit through roof support and tighten
roof support around outer rigid pipe and with provided 1/2" long screws ensuring
pipe is vertically plumb and extends below roofline approximately 1 foot below
lowest opening in roof or enough to facilitate connection to outer flexible pipe.
c.
Inner flue pipe provided in 2DVK-VX kits are 48" longer than outer pipe and
include 4 additional coaxial flexible spacers.
d.
Install spacers every foot on inner flue pipe and route inner flue pipe through 42"
long rigid pipe yielding a coaxial assembly.
Rigid
Pipe
Secure Roof
Termination
Support to
Rigid Pipe
with Bolts/
Nuts & 3
Self-drilling
Screws
Secure Roof
Termination
Support to Top
of Roof Using
Field Supplied
Hardware
Route Inner
Flexible Pipe
with Coaxial
Flexible
Spacers
Through
Rigid Pipe
Apply Mill-Pac Black Sealant &
Secure with Screws:
Outer Rigid Pipe to Outer Flexible Pipe
Fig. 11 Roof Termination Support Installation