PARTS IDENTIFICATION
ITEM NO.
DESCRIPTION
QTY.
1
ANCHOR BOLT
8
2
RIGHT SIDE UPRIGHT ASSEMBLY
1
3
LEFT SIDE UPRIGHT ASSEMBLY
1
4
WASHER
6
5
SHOULDER SCREW
4
6
LEFT LATCH ASSEMBLY
1
7
RIGHT LATCH ASSEMBLY
1
8
LEFT SIDE UPPER BARRIER
1
9
RIGHT SIDE UPPER BARRIER
1
10
TIE ROD
2
11
COTTER PIN
2
12
CLEVIS PIN
2
13
SHIM, FLAT
12
Before starting installation, verify that all
components and required tools are at hand.
IMPORTANT
Tape Measure
Framing Square
Marker
Mason Drill
5/8” Mason Bit
Compressed Air or Vacuum
Torque Wrench (80 ft-lbs)
15/16” Socket / Wrench
Long, large screwdriver or small pry bar
Hammer
Needle Nose Pliers
1/4” Allen Wrench
Level
Shims
INSTALLATION TOOLS REQUIRED
3
NOVA Dock Sentinel
TM
Installation Manual
Figure 1: Parts Identification
Содержание Dock Sentinel DG-048-000
Страница 11: ...BARRIER STABILIZER ADJUSTMENT 11 NOVA Dock SentinelTM Installation Manual Figure 14...
Страница 12: ...PARTS LISTS LEFT SIDE MAIN ASSEMBLY NOVA Dock SentinelTM Installation Manual 12 Figure 15...
Страница 14: ...LEFT SIDE SECONDARY ASSEMBLY NOVA Dock SentinelTM Installation Manual 14 Figure 16...
Страница 17: ...NOTES 17 NOVA Dock SentinelTM Installation Manual This page left intentionally blank...
Страница 18: ...RIGHT SIDE MAIN ASSEMBLY 18 NOVA Dock SentinelTM Installation Manual Figure 18...
Страница 20: ...RIGHT SIDE SECONDARY ASSEMBLY 20 NOVA Dock SentinelTM Installation Manual Figure 19...