Nova Florida VELA COMPACT Скачать руководство пользователя страница 6

6

1. Boiler working mode led (multi-color)

See no. 1 chart at the bottom of the page for further details on 

color displayed by led in relation to boiler working mode.

2. Boiler working mode led (multi-color)

See no. 1 chart at the bottom of the page for further details on 

color displayed by led in relation to boiler working mode.

3. Water pressure gauge

The gauge shows water pressure in the CH system.

4. CH selector and adjusting knob

The knob activates or de-activates CH operation, and adjusts CH 

water temperature between a minimum of 35°C and a maximum 

of 78°C.

When the knob is set to 

 (fully turned counter-clockwise), the 

boiler is set to summer mode and CH operation is de-activated.

4. DHW selector and boiler shutdown reset

The knob sets the boiler to stand-by (

position, fully turned coun-

ter-clockwise), and adjust DHW temperature between a minimum 

of 35°C and a maximum of 58°C.

When the boiler has shut down is to be reset by turning the knob 

to 

 position.

WARNING

The boiler has a special built-in regulator limiting DHW flow up to 

10 liter per minute. In addition to the setting of no. 5 selector,

the temperature of the DHW supplied also depends on the flow 

requested by the user and the temperature of the water mains 

supply.

1. INSTRUCTIONS FOR THE USER

1.1 CONTROL PANEL

Pic. 1 – Control panel

1

2

3

5

4

No. 1 Chart – Color displayed by led in relation to boiler operation status

LED 1

LED 2

Power connected to boiler

n/a

GREEN

Flame presence

n/a

YELLOW

Active CH mode

GREEN

n/a

Shutdown due to flame absence

OFF

RED

Flue gas thermostat shutdown (CTN)

Air/flue gas pressure switch shutdown (CTFS)

YELLOW

OFF

Safety thermostat shutdown

RED

OFF

Safety thermostat shutdown

FLASHING GREEN

OFF

Gas valve alarm

FLASHING YELLOW

OFF

Water pressure switch alarm (>85°)

FLASHING RED

n/a

CH flow probe alarm

FLASHING YELLOW/RED

OFF

DHW flow probe alarm

FLASHING GREEN/RED

OFF

KEY CHART TO ACHRONYMS

OFF  

LED off

RED  

LED on, displaying the color stated in the chart

FLASHING RED LED flashing, displaying the color stated in the chart
RED/GREEN LED flashing, displaying in sequence the colors stated in the chart
n/a  

LED status is not relevant

Содержание VELA COMPACT

Страница 1: ...CTN 24 RTN 24 CTFS 24 RTFS 24 CTFS 28 RTFS 28 INSTALLATION USE AND MAINTENANCE GB IST 04 C 167 02 VELA COMPACT...

Страница 2: ...2 Dear Customer Thank you for choosing and buying one of our boilers Please read these instructions carefully in order to install operate and maintain this equipment properly...

Страница 3: ...s all the materials can be recycled The packaging must therefore be sent to specific waste management sites Keep the packaging out of the reach of children as it may represent a choking and suffocatio...

Страница 4: ...Positioning the boiler Page 17 3 2 4 Installing the boiler Page 18 3 2 5 Boiler room ventilation Page 18 3 2 6 Air intake and flue gas discharge system Page 18 3 2 6 1 Natural draught boiler Page 18 3...

Страница 5: ...pipe system CTFS Page 22 Pic 13 Dimensions for connection to air intake and flue gas discharge split pipe system CTFS Page 22 Pic 14 Split pipe system examples Page 23 Pic 15 Additional split pipe sy...

Страница 6: ...WARNING The boiler has a special built in regulator limiting DHW flow up to 10 liter per minute In addition to the setting of no 5 selector the temperature of the DHW supplied also depends on the flo...

Страница 7: ...ce that allows a maximum DHW flow of 10 liter per minute Available DHW liters per minute depend on boiler thermal output and water mains supply temperature according to the following formula l DHW lit...

Страница 8: ...due to water pressure switch intervention no 1 LED flashes yellow Fill up the boiler by opening the loading tap A pic 2 located in the lower area of the boiler next to the hydraulic connections Water...

Страница 9: ...h can be reached without using technical equipment and or tools therefore the user is not authorized to remove the boiler casing and act upon inside components Nobody including qualified personnel is...

Страница 10: ...nd ionization flame detection device Air flue gas pressure switch CTFS Flue gas thermostat CTN Twin shutter modulating gas valve User Interface Central heating selector adjusting knob 35 C 78 C range...

Страница 11: ...bar Model CTN Pic 3 CTN model dimensions bottom view top view G Gas inlet 1 2 M CH flow 3 4 C DHW flow 1 2 F Cold water inlet 1 2 R CH return 3 4 Dimensions for connection to base hydraulic kit option...

Страница 12: ...l CTFS Pic 4 CTFS model dimensions top view bottom view G Gas inlet 1 2 M CH flow 3 4 C DHW flow 1 2 F Cold water inlet 1 2 R CH return 3 4 Dimensions for connection to base hydraulic kit option Dimen...

Страница 13: ...water inlet filter M CH flow C DHW flow G Gas intake F Water mains inlet R CH return 1 DHW temperature probe 2 Modulating gas valve 3 CH temperature probe 4 Burner nozzles 5 Burner 6 Ignition flame s...

Страница 14: ...ter supply T 40 C 8 0 l min Hot water supply T 35 C 9 1 l min Hot water supply T 30 C 10 6 l min Hot water supply T 25 C 12 7 l min mixed water to the tap CTFS 24 AF Function Max heat input Max heat o...

Страница 15: ...ity of expansion vessel l 6 6 Maximum recommended CH system capacity l 100 100 No 4 chart General characteristics Value related to 15 C 1013 mbar condition Maximum water temperature of 83 C vessel pre...

Страница 16: ...ed instructions Packaging includes one plastic bag containing a installation use and maintenance manual b wall mounting template pic 7 d two screws and wall plugs in order to affix the boiler to the w...

Страница 17: ...the boiler is secured to the wall using two screws and wall plugs The lower part of the template shows the areas to be marked for the couplings positioning of boiler con nection to the gas supply pipe...

Страница 18: ...not withdraw combustion air from the room where the boiler is installed so specific recommendations do not need to be applied involving air intake ventilation openings or concerning boiler room requir...

Страница 19: ...protected by a sheath duct the part of the sheath duct facing the inside of the building is to be sealed while the part facing outwards is to be left open its end section on which the terminal is to i...

Страница 20: ...C32 This boiler is designed to be con nected to vertical outlet and intake ducts connected to the outside by means of coa xial or split ducts The distance between the air intake duct and the gas flue...

Страница 21: ...er mm 1 L 2 42 5 2 L 4 No diaphragm the first elbow from the boiler is not to be accounted for Pipe length m Flue gas discharge diaphragm diameter mm 1 L 2 42 5 2 L 4 No diaphragm Type C32 Minimum per...

Страница 22: ...as discharge pipe is 0 5 meter Each wide radius 90 elbow R D in flue gas discharge equals a 1 5 meter long pipe section Each narrow radius 90 elbow R D in flue gas discharge equals a 3 5 meter long pi...

Страница 23: ...knob pic 1 to the desired setting 3 2 7 2 Split pipe system In order to determine combustion performance the following measurements must be implemented Measure air temperature from no 2 opening shown...

Страница 24: ...system components and damage the pump or the heat exchanger CENTRAL HEATING CH flow pipe and CH return pipe must be connected to their relevant 3 4 coupling on the boiler see pic 7 When sizing CH syst...

Страница 25: ...adiators and verify the boiler automatic valve operation gradually open the relevant loading tap pic 2 checking all automatic air purging valves installed in the system properly work close all radiato...

Страница 26: ...edure is to be carried out by qualified technical personnel the gas supply stopcock is open there are no gas leaks the main switch external to the boiler is set to on the 3 bar safety valve is not blo...

Страница 27: ...27 Pic 18 Wiring diagram...

Страница 28: ...51 10 17928 16539 15271 14113 13054 20 12084 11196 10382 9634 8948 30 8317 7736 7202 6709 6254 40 5835 5448 5090 4758 4452 50 4168 3904 3660 3433 3222 60 3026 2844 2674 2516 2369 70 2232 2104 1984 187...

Страница 29: ...WARNING It is mandatory to install the copper gaskets re install the main burner on the electronic board switch CM1 CH4 GPL jumper to CH4 position pic 19 Pic 19 Methane LPG selecting jumper A Maximum...

Страница 30: ...ue gas evacuation ducts and terminal are implemented according to instruction when the boiler is running products generated by combustion are not to leak from gaskets power mains supply to boiler is 2...

Страница 31: ...servation and leakage check draught stop device for good state of preservation CTN check absence of flue gas reflux in the room and correct flue gas discharge CTN check operation of safety thermostat...

Страница 32: ...The silicone pipes of switch are disconnected or damaged Connect or replace silicone pipes Air intake or flue gas discharge flow is nor correct Check air intake or flue gas discharge Fan is faulty Rep...

Страница 33: ...working System insufficient pressure or flow rate Check DHW system Check DHW flow meter filter DHW flow meter sensor is faulty or disconnected Replace or reconnect it DHW flow meter sensor is blocked...

Страница 34: ...34...

Страница 35: ...35...

Страница 36: ...nufacturer reserves the right to implement any necessary and or useful variation to products without modifying fundamental characteristics Fondital S p A Via Mocenigo 123 25078 VESTONE Brescia Italy T...

Отзывы: