Nova Florida VELA COMPACT Скачать руководство пользователя страница 4

4

CONTENTS

General information for the Installer, Maintenance Technician and User 

Page  3

1.

Instructions for the User 

Page

6

1.1  Control panel 

Page

6

1.2  Operating the boiler 

Page

7

  1.2.1 Switching 

on 

Page

7

  1.2.2 Operation

Page

7

  1...3

Boiler 

shut-down 

Page

8

  1.3.1 Burner 

shut-down 

Page

8

 

 

1.3.2 Shut-down due to overheating 

Page

8

 

 

1.3.3 Shut-down due to low water pressure 

Page

8

 

 

1.3.4 Shut-down due to incorrect air/flue gas system draught

Page

8

 

 

1.3.5 Shut-down due to malfunction of temperature probes

Page

8

1.4  Maintenance 

Page

9

1.5 Notes for the User 

Page

9

2.

Technical characteristics and dimensions 

Page 10

 

2.1 Technical characteristics 

Page 10

 2.2 

Dimensions 

Page 11

 

2.3 Hydraulic layouts

Page 13

 

2.4 Operating data 

Page 14

 

2.5 General characteristics 

Page 15

3.

Instructions for the Installer 

Page 16

 

3.1 Installation Standards 

Page 16

 3.2 

Installation 

Page 16

  3.2.1 Packaging

Page 16

 

 

3.2.2 Choosing where to install the boiler 

Page 16

 

 

3.2.3 Positioning the boiler 

Page 17

 

 

3.2.4 Installing the boiler 

Page 18

 

 

3.2.5 Boiler room ventilation 

Page 18

 

 

3.2.6 Air intake and flue gas discharge system 

Page 18

 

 

 

3.2.6.1 Natural draught boiler 

Page 18

 

 

 

3.2.6.2 Forced draught boiler 

Page  20  

 

 

 

3.2.6.2.1 Configuration of air intake and flue gas discharge ducts 

Page  20  

 

 

 

3.2.6.2.2 Air intake and flue gas discharge system via 100/60 mm coaxial pipes 

Page  21

 

 

 

3.2.6.2.3 Air intake and flue gas discharge system via 80/80 mm split pipes 

Page  22

 

 

3.2.7 Checking combustion efficiency 

Page  23

 

 

 

3.2.7.1 Coaxial pipe system 

Page  23

 

 

 

3.2.7.2 Split pipe system

Page  23

 

 

3.2.8 Gas mains connection

Page  24

  3.2.9 Plumbing 

connections

Page  24

 

 

3.2.10 Power mains connection

Page  25

 

 

3.2.11 Room thermostat connection (optional equipment)

Page  25

 

3.3 Loading the system 

Page  25

 

3.4 Starting the boiler 

Page  26

  3.4.1 Preliminary 

checks 

Page  26

 

 

3.4.2 Switching on and switching off 

Page  26

 

3.5 Wiring diagram

Page  26

 

3.6 Adaptation to other gas types and burner adjustment 

Page  29

4.

Testing the boiler 

Page 30

 

4.1 Preliminary checks 

Page  30

 

4.2 Switching on and switching off 

Page  30

5.

Maintenance

Page 31

6.

Troubleshooting 

Page 32

Содержание VELA COMPACT

Страница 1: ...CTN 24 RTN 24 CTFS 24 RTFS 24 CTFS 28 RTFS 28 INSTALLATION USE AND MAINTENANCE GB IST 04 C 167 02 VELA COMPACT...

Страница 2: ...2 Dear Customer Thank you for choosing and buying one of our boilers Please read these instructions carefully in order to install operate and maintain this equipment properly...

Страница 3: ...s all the materials can be recycled The packaging must therefore be sent to specific waste management sites Keep the packaging out of the reach of children as it may represent a choking and suffocatio...

Страница 4: ...Positioning the boiler Page 17 3 2 4 Installing the boiler Page 18 3 2 5 Boiler room ventilation Page 18 3 2 6 Air intake and flue gas discharge system Page 18 3 2 6 1 Natural draught boiler Page 18 3...

Страница 5: ...pipe system CTFS Page 22 Pic 13 Dimensions for connection to air intake and flue gas discharge split pipe system CTFS Page 22 Pic 14 Split pipe system examples Page 23 Pic 15 Additional split pipe sy...

Страница 6: ...WARNING The boiler has a special built in regulator limiting DHW flow up to 10 liter per minute In addition to the setting of no 5 selector the temperature of the DHW supplied also depends on the flo...

Страница 7: ...ce that allows a maximum DHW flow of 10 liter per minute Available DHW liters per minute depend on boiler thermal output and water mains supply temperature according to the following formula l DHW lit...

Страница 8: ...due to water pressure switch intervention no 1 LED flashes yellow Fill up the boiler by opening the loading tap A pic 2 located in the lower area of the boiler next to the hydraulic connections Water...

Страница 9: ...h can be reached without using technical equipment and or tools therefore the user is not authorized to remove the boiler casing and act upon inside components Nobody including qualified personnel is...

Страница 10: ...nd ionization flame detection device Air flue gas pressure switch CTFS Flue gas thermostat CTN Twin shutter modulating gas valve User Interface Central heating selector adjusting knob 35 C 78 C range...

Страница 11: ...bar Model CTN Pic 3 CTN model dimensions bottom view top view G Gas inlet 1 2 M CH flow 3 4 C DHW flow 1 2 F Cold water inlet 1 2 R CH return 3 4 Dimensions for connection to base hydraulic kit option...

Страница 12: ...l CTFS Pic 4 CTFS model dimensions top view bottom view G Gas inlet 1 2 M CH flow 3 4 C DHW flow 1 2 F Cold water inlet 1 2 R CH return 3 4 Dimensions for connection to base hydraulic kit option Dimen...

Страница 13: ...water inlet filter M CH flow C DHW flow G Gas intake F Water mains inlet R CH return 1 DHW temperature probe 2 Modulating gas valve 3 CH temperature probe 4 Burner nozzles 5 Burner 6 Ignition flame s...

Страница 14: ...ter supply T 40 C 8 0 l min Hot water supply T 35 C 9 1 l min Hot water supply T 30 C 10 6 l min Hot water supply T 25 C 12 7 l min mixed water to the tap CTFS 24 AF Function Max heat input Max heat o...

Страница 15: ...ity of expansion vessel l 6 6 Maximum recommended CH system capacity l 100 100 No 4 chart General characteristics Value related to 15 C 1013 mbar condition Maximum water temperature of 83 C vessel pre...

Страница 16: ...ed instructions Packaging includes one plastic bag containing a installation use and maintenance manual b wall mounting template pic 7 d two screws and wall plugs in order to affix the boiler to the w...

Страница 17: ...the boiler is secured to the wall using two screws and wall plugs The lower part of the template shows the areas to be marked for the couplings positioning of boiler con nection to the gas supply pipe...

Страница 18: ...not withdraw combustion air from the room where the boiler is installed so specific recommendations do not need to be applied involving air intake ventilation openings or concerning boiler room requir...

Страница 19: ...protected by a sheath duct the part of the sheath duct facing the inside of the building is to be sealed while the part facing outwards is to be left open its end section on which the terminal is to i...

Страница 20: ...C32 This boiler is designed to be con nected to vertical outlet and intake ducts connected to the outside by means of coa xial or split ducts The distance between the air intake duct and the gas flue...

Страница 21: ...er mm 1 L 2 42 5 2 L 4 No diaphragm the first elbow from the boiler is not to be accounted for Pipe length m Flue gas discharge diaphragm diameter mm 1 L 2 42 5 2 L 4 No diaphragm Type C32 Minimum per...

Страница 22: ...as discharge pipe is 0 5 meter Each wide radius 90 elbow R D in flue gas discharge equals a 1 5 meter long pipe section Each narrow radius 90 elbow R D in flue gas discharge equals a 3 5 meter long pi...

Страница 23: ...knob pic 1 to the desired setting 3 2 7 2 Split pipe system In order to determine combustion performance the following measurements must be implemented Measure air temperature from no 2 opening shown...

Страница 24: ...system components and damage the pump or the heat exchanger CENTRAL HEATING CH flow pipe and CH return pipe must be connected to their relevant 3 4 coupling on the boiler see pic 7 When sizing CH syst...

Страница 25: ...adiators and verify the boiler automatic valve operation gradually open the relevant loading tap pic 2 checking all automatic air purging valves installed in the system properly work close all radiato...

Страница 26: ...edure is to be carried out by qualified technical personnel the gas supply stopcock is open there are no gas leaks the main switch external to the boiler is set to on the 3 bar safety valve is not blo...

Страница 27: ...27 Pic 18 Wiring diagram...

Страница 28: ...51 10 17928 16539 15271 14113 13054 20 12084 11196 10382 9634 8948 30 8317 7736 7202 6709 6254 40 5835 5448 5090 4758 4452 50 4168 3904 3660 3433 3222 60 3026 2844 2674 2516 2369 70 2232 2104 1984 187...

Страница 29: ...WARNING It is mandatory to install the copper gaskets re install the main burner on the electronic board switch CM1 CH4 GPL jumper to CH4 position pic 19 Pic 19 Methane LPG selecting jumper A Maximum...

Страница 30: ...ue gas evacuation ducts and terminal are implemented according to instruction when the boiler is running products generated by combustion are not to leak from gaskets power mains supply to boiler is 2...

Страница 31: ...servation and leakage check draught stop device for good state of preservation CTN check absence of flue gas reflux in the room and correct flue gas discharge CTN check operation of safety thermostat...

Страница 32: ...The silicone pipes of switch are disconnected or damaged Connect or replace silicone pipes Air intake or flue gas discharge flow is nor correct Check air intake or flue gas discharge Fan is faulty Rep...

Страница 33: ...working System insufficient pressure or flow rate Check DHW system Check DHW flow meter filter DHW flow meter sensor is faulty or disconnected Replace or reconnect it DHW flow meter sensor is blocked...

Страница 34: ...34...

Страница 35: ...35...

Страница 36: ...nufacturer reserves the right to implement any necessary and or useful variation to products without modifying fundamental characteristics Fondital S p A Via Mocenigo 123 25078 VESTONE Brescia Italy T...

Отзывы: