Mark
Top-of-bracket Line
Measure The Distance Of Two Wall Bracket
Installation of bracket
1. Identify all parts packed in carton
against the parts list. Remove all
protective material. Place Parts on
non-abrasive surface to avoid scratches.
Do not attempt assembly if any parts are
missing or damaged.
2. Find an appropriate place over 2.5m to
the floor or ground for assembling the
awning on the wall and place a mark.
3. Draw a line on the wall with a ruler
according to the mark. It will be the
top-of-bracket line (the line must be
horizontal). This is to say, this line might
not be parallel with other structural lines,
such as siding, etc.
4. Locate where wall brackets are to be
installed and mark. The brackets must be
assembled onto the wall vertically.
Parts List
Warning! Make sure you are
the
using all of
hardware included in the package. Not using any
pieces may weaken the structure of the awning and can be a potential safety hazard.
of the
A
1PC
B1
B2
2PCS
2PCS
1PC
4SETS
2SETS
C
D
E
Either B1 or B2 is
workable in following
steps.