Page of 5
3
Figure A
Figure B
STEP 2
Start by adding a laminate shelf to the level previously built, then continue working by adding the
second level using two (2) beams and two (2) braces in the post slots of your desired location.
Again place the rivets of the beams and braces into the post slots with the shelf ledge facing up
and tap lightly to seat the rivets.
IMPORTANT NOTE: MAKE SURE ALL RIVETS ARE FULLY SEATED INTO THE POST
SLOTS.
Figure D
STEP 3 (Note: Post are directional. The slot must point down.)
Add a laminate shelf to the previously built level,
then assemble the top post to the bottom post
by using two (2) beams and two (2) braces. One
(1) rivet from each beam and brace must be
placed in the top hole of the bottom post, and
the bottom hole of the top post (see figure D).
After all beams and braces are in place, tap
lightly to properly seat the rivets.