background image

7

TAKING DOWN THE GREENHOUSE

Step 8

 Pull up all stakes from the ground. 

 Press the push button on each leg and retract the legs to their compact height.

 From underneath the greenhouse canopy, rotate the bottom of the Solo Latch counterclockwise 

     to unlock and retract the frame.

 Take off the PE top, lift one corner of the frame until all legs are raised off the ground except 

     for the 1 leg on the opposite corner. Push inward until the frame is fully closed. Always make 
     sure your cover is completely dry before folding up and storing. Failure to do so may result in 
     mildew or residue build up.  

Содержание 6 ft x 8 ft Expandable Greenhouse

Страница 1: ...INSTRUCTION MANUAL 6 ft x 8 ft Expandable Greenhouse ...

Страница 2: ...dable Greenhouse Assembly Instructions SHOULD YOU HAVE ANY QUESTIONS REGARDING THE ASSEMBLY OR PARTS OF YOUR NEW NORWEST OUTDOOR ITEM PLEASE DO NOT RETURN TO THE STORE INSTEAD CALL 1 360 883 6082 OR WRITE TO CUSTOMERSERVICE NORWESTOUTDOOR COM ...

Страница 3: ...cause any fabric to fade and deteriorate and is NOT covered by this 1 Year Limited Warranty All replacement products or parts will assume the remaining warranty of the original product This warranty gives you specific legal rights that may vary from state to state It is your responsibility to read and save these instructions before attempting to set up your canopy Please read and follow the safety...

Страница 4: ...1 PACKING INCLUDES Hardware A Greenhouse Frame 1pc B Canopy Top with Sidewalls 1pc AA Stake 14pcs BB Rope 4pcs Parts List ...

Страница 5: ...NHOUSE FRAME Step 2 ATTACHING THE GREENHOUSE COVER Lift and partially pull the greenhouse frame apart Unfold the greenhouse cover unzip the door and place on top of the greenhoues frame Secure the greenhouse cover to the corners of the greenhouse frame ...

Страница 6: ... From under the greenhouse frame use one hand to push the Solo Latch straight up until it clicks onto the central pole LOCKING THE FRAME ADJUSTING THE GREENHOUSE HEIGHT Press the push button on each leg and raise the leg height into locking positon ...

Страница 7: ...CURING THE GREENHOUSE COVER Secure the greenhouse cover to the eaves of the greenhouse frame using the Velcro connections Secure the greenhouse sidewall to the legs of the greenhouse frame using the Velcro connections Velcro Velcro Velcro ...

Страница 8: ...ootpad of each greenhouse leg Tie four ropes to the corners of the top fabric Measure out from each leg to a proper distance and secure four stakes to the ground Tie the ropes to the stakes in the ground Ensure the rope has the proper tension by adjusting the plastic adjusters on the ropes X6 loop loop ...

Страница 9: ...OR AND THE CURTAIN Front and back entrances can be rolled up and tied for easy access The side window covers can also be rolled up and tied off to increase ventilation as needed 6 SETTING UP THE GREENHOUSE Step 7 unzip ...

Страница 10: ...ate the bottom of the Solo Latch counterclockwise to unlock and retract the frame Take off the PE top lift one corner of the frame until all legs are raised off the ground except for the 1 leg on the opposite corner Push inward until the frame is fully closed Always make sure your cover is completely dry before folding up and storing Failure to do so may result in mildew or residue build up ...

Страница 11: ...olo Latch 9 Peak Ceiling Assembly 3 Top Cap 10 Left Leg Assembly Right Leg Assembly 4 Left Top bracket 5 Left Slider Right Top bracket Right Slider 6 Entry Sider Eave Assembly 7 Sider Eave Assembly 12 13 Plastic Footpad 11 15 17 16 Bolt Kit Stake Rope 18 19 14 Canopy Top Leg Extender 1 3 4 5 10 17 18 11 19 16 2 6 7 9 8 13 12 14 15 1 2 3 10 11 9 8 16 4 6 5 7 12 14 15 13 ...

Отзывы: