background image

Frame (2) 
Built  in  aluminium  profile,  the  frame  is  light  and  resistant.  The  welded-steel  side  of  the  machine 
ensure that the axles are parallel to the table. The axle assembly can also be tilted until 45º to make 
bevel cuts. The head axles (3) made of aluminium, guide the cutting head over the table. The head 
consoles (4) ensure the parallelism of the two axles, and rigidity of the assembly. 
 
Blade guard (5) 

Jig-welded steel construction with 350mm-diameter blade capacity, which offers maximum operator 
protection and increased visibility of the work piece. 
Incorporated  in the  blade  guard  is  an  outer metal  cover,  which  can  be  easily  hinged  opened.  This 
allows easy access to shaft for inspection and blade replacement when motor is switched off, while 
fully protecting the blade when in operation. 

 
Cutting head (6) 

Jig-welded steel console. Console supports the electric motor and the blade guard. The movement 
of  the  cutting  head  on  the  axles  involves  nylon  wheels.  The  balancing  of  the  cutting  head  is 
achieved using a heavy-duty spring. A depth-locking device (7) fixed over the cutting head enables 
the operator to set the cutting head to desired or to maximum cutting depth. 
 
Down feed and cutting depth adjustment  
The  spring-loaded  cutting  head,  activated  by  hand  with  the  grip  over  the  blade  guard  ensures 
smooth  lowering  of  the  cutting  head  for  shock-free  penetration  of  the  work  piece  and  improved 
control of the cutting pressure.  
 

Cutting table (8) 
Large,  heavy-duty  table  fitted  with  water  flow-control  vents.  The  table  is  equipped  with  backstops 

and a guide-a-cut device (9). 
 
Water cooling system (10) 
The coolant system comprises:  

  A powerful, submersible electrical water pump. 

  Plastic suction pipe delivering the water from the water pan to the cutting head. 

  A large capacity aluminium water pan supplied with drain plug. 

  A water-tap, fitted to the blade guard, permitting controlled water flow. 

  Two  water  nozzles  located  on  both  side  of  the  blade  guard  ensure  adequate  flow  of  water  to 

both sides of the cutting blade. 

 
Electrical Motor (11) and switch (12) 

Leroy-Somer motor with 2,2kW. Low voltage trigger (NVR) built in the switch prevents the motor to 
restart for example after a power cut. 
The electric motor has an overload protection. Thermal overload tripping can occur for two reasons:  
a.  tripping under light load 

If connection is incorrect 

b.  tripping under heavy load 

If motor has been overloaded 

Содержание CST 100 Modulo

Страница 1: ...CST 65 85 100 MODULO OPERATING INSTRUCTIONS...

Страница 2: ...2...

Страница 3: ...ST 85 Modulo 230V 70184620266 CST 100 Modulo 230V 70184620024 is in conformity with the following Directives European Machinery Directive 2006 42 EC LOW TENSION 73 23 CEE Electromagnetic Compatibility...

Страница 4: ...4...

Страница 5: ...12 3 1 Tool assembly 12 3 2 Handle assembly 12 3 3 Electrical connections 12 3 4 Starting the machine 12 3 5 Water cooling system 13 4 Transport and storing 14 4 1 Securing for transport 14 4 2 Transp...

Страница 6: ...e user Observing the operating instructions and compliance with inspection and servicing requirements shall also be considered as included under use in accordance with the regulations 1 1 Symbols Impo...

Страница 7: ...8 of the Protection of Eyes Regulation 1974 Regulation 2 2 Part 1 For security reasons never leave the machine unattended untied or unlocked While the engine is running Do not move the machine whilst...

Страница 8: ...ely appreciate the attention given to detail and quality of materials used in construction The machine and its component parts are assembled to high standards assuring long life and minimum maintenanc...

Страница 9: ...e operator to set the cutting head to desired or to maximum cutting depth Down feed and cutting depth adjustment The spring loaded cutting head activated by hand with the grip over the blade guard ens...

Страница 10: ...ting length 650 mm Rotation speed of the blade 3000 min 1 Length 1330 mm Width 660 mm Height with feet 1550 mm Height without feet 905 mm Water pan capacity 25 l Weight total 120 kg 120 kg 122 kg Weig...

Страница 11: ...kW Tension 230V 1 115V 1 400V 3 Cutting length 1000 mm Rotation speed of the blade 3000 min 1 Length 1680 mm Width 660 mm Height with feet 1550 mm Height without feet 905 mm Water pan capacity 35 l W...

Страница 12: ...ce outer blade flange Tighten hexagonal nut with spanner supplied for this purpose Shut retractable blade guard cover and tighten the two knobs The blade bore must correspond exactly to the diameter o...

Страница 13: ...t handle on water tap should be in line with water flow Ensure that water is flowing freely in the circuit and is delivered adequately to both sides of the blade as insufficient water supply may resul...

Страница 14: ...wheels You must first fold away the feet Two operators are required for this Lift the rear handle and push lightly on the rear foot of the machine with your foot The foot of the machine will automatic...

Страница 15: ...e other ready to shut the machine down in case of emergency Always keep your hands away from the moving blade Lower the cutting head to the desired cutting depth in through cutting lower cutting head...

Страница 16: ...ked the working procedure dry or wet cut to be carried out and the required efficiency Apply cooling water continuously whilst cutting and in good time Make sure the water pan contains enough water Wh...

Страница 17: ...Motor housing Clean Reachable nuts and screws Tighten up Maintenance of the motor Always perform the maintenance of the motor with the machine isolated from the electrical supply Cleaning of the mach...

Страница 18: ...tion cable Defective switch CAUTION can only be solved by qualified electrician Motor is not running Defective motor Change motor or contact motor manufacturer Cutting advance too quick Cut slowly Bla...

Страница 19: ...19 Circuit diagram 230V Motor...

Страница 20: ...20 115V Motor...

Страница 21: ...21 400V Motor...

Страница 22: ...ays the quickest way Clear instructions will avoid problems and faulty deliveries If not sure please send us the defective part In the case of a warranty claim the part must always be returned for eva...

Страница 23: ...ts GmbH Birkenweg 45 49 D 50389 WESSELING Tel 02236 8911 0 Fax 02236 8911 30 e mail sales ngg saint gobain com Spain Saint Gobain Abrasivos S A Ctra Guipuzcoa km7 5 E 31195 BERRIOPLANO Navarra Tel 003...

Страница 24: ...24 SAINT GOBAIN ABRASIVES 190 Bd J F Kennedy L 4930 BASCHARAGE LUXEMBOURG Tel 352 50401 1 Fax 352 501633 e mail sales nlx saint gobain com www construction norton eu 29 09 2008...

Отзывы: