13
3.5 Water cooling system
Fill the water pan with clean water to approximately 2cm from top (ensure that bottom of pump is
fully immersed in water). Use the pump switch so you can use the pump.
Open water-tap at blade guard (note that handle on water-tap should be in line with water-flow).
Ensure that water is flowing freely in the circuit and is delivered adequately to both sides of the
blade, as insufficient water supply may result in premature failure of the diamond blade.
The water pump must never run without water. Always make sure that there is enough water in the
pan and refill if necessary.
In case of frost, empty the water cooling system from its water.
Содержание CST 100 Modulo
Страница 1: ...CST 65 85 100 MODULO OPERATING INSTRUCTIONS...
Страница 2: ...2...
Страница 4: ...4...
Страница 19: ...19 Circuit diagram 230V Motor...
Страница 20: ...20 115V Motor...
Страница 21: ...21 400V Motor...