Northland Crown Royal 1000 Скачать руководство пользователя страница 23

MaInTenanCe

Pristine series installation and oPeration Manual • 2011 

21

during Heating season

1.  Establish a daily routine for storage of fuel and care 

of the furnace. Check frequently for crusted ash 

buildup until experience shows how often cleaning 

is necessary. Be aware that the hotter the fire, the 

less creosote, and that weekly cleanings may be 

necessary in mild weather, even though monthly 

cleanings may be enough in the coldest months. 

Have a clearly understood plan in place in the event 

of a chimney fire.

2.  The secondary burn chamber must be cleaned out 

bi-weekly as necessary. Ensure that the ash clean 

out door is securely closed after each cleaning.

  Place ashes in a steel container with a tightly fitting 

lid. Other waste should not be placed in the container 

with the ashes.

3.  Check the water level daily, ensure the level is well 

above the “ADD” mark.

  Oxygen buildup causes corrosion inside the water 

system.  Keeping  the  water  reservoir  completely  full 

avoids oxygen buildup, especially during the summer 

months when the furnace is not in use.

4.  Check the door and lid gaskets to ensure an air tight 

fit. Adjust hinges and latch as needed.

5.  Check  and  clean  the  heat  exchanger  flues  several 

times per season. A buildup in the flues and chimney 

will cause a poor draft and reduce efficiency (see pg 

19).

6.  Cover plates and guards must be in place at all times, 

except during maintenance and servicing.

7.  Rear access cover must be secured with screw. 

Tighten with a wrench.

8.  All doors must be closed during operation.

end of Heating season

1.  Thoroughly clean the exhaust area, secondary burn 

chamber,  and  flues  of  any  loose  or  crusted  ash 

buildup. Crusted ashes are easier to remove when 

furnace is still warm. Note: a thin black coating in the 

firebox is acceptable, but ensure that there is no ash 

in contact with bare metal.

2.  Check for damaged brick and replace as necessary. 

Contact your dealer for replacement brick.

3.  Check to ensure there is no moisture in any part of 

the inside of the firebox, secondary burn chamber, 

or exhaust area. Apply a thin film of oil in the flue 

area and exhaust area.

4.  Chimney must have a rain cap.

 

Failing to properly clean the furnace and protect it 

from moisture during the off-season will void the 

warranty.

5. 

do not 

run the furnace in the summer months when 

the load demand is very low (ie., only domestic hot 

water is being heated.)

6.  Ensure the water reservoir is full during the non-

heating season to prevent corrosion inside the water 

jacket.

7.  Add the correct amount (as indicated on water 

treatment bottle) of Northland Distributing approved 

water treatment to the water system each year after 

the heating season. Operate the water circulating 

pump for 24 hours after adding water treatment to 

ensure proper mixing of the water treatment with 

the water.

8.  Draw a water sample once a year and forward to a 

certified lab. Contact your dealer for details.

  Water properly treated with Northland Distributing 

approved water treatment should have a ph level 

between 9.1 and 10.7, a nitrate level between 730 

and 1460 ppms as NaNO2, and a conductivity must 

be less than or equal to 4000 mmhos.

  If the pH or nitrite level is low, more Northland 

Distributing approved water treatment should be 

added. If the level of conductivity is too high, 1/2 

the water in the unit should be drained and replaced 

with fresh water.

  Failing to use northland distributing approved 

water treatment in accordance with the 

installation and operation instruction Manual will 

void the warranty. see your dealer for authorized 

supplies. it is the responsibility of the owner to 

maintain yearly water sample results on file.

Содержание Crown Royal 1000

Страница 1: ...Installation and Operation Instructions Crown Royal Stoves Pristine Series Model 1000...

Страница 2: ......

Страница 3: ...himney Installation 10 Supplying Make Up Air 11 Water Line Hookup 11 Circulating Pump Electrical Hookup 11 Furnace Electrical Hookup 11 Typical Installation 12 Hookup to the Existing Heat System Water...

Страница 4: ...Fire Brick and Insulation 19 Blower Draft Setting 20 Doors 20 Exhaust Exit Lever Operation 20 Power Outages 20 Operation Do s and Don ts 20 Maintenance 21 During Heating Season 21 End of Heating Seas...

Страница 5: ...d wood gasification to produce highly efficient combustion in the furnace s dual burn chambers 1 Wood in the firebox burns from the bottom up drying the top layer of wood in the firebox and forcing ga...

Страница 6: ...91 De ULC 2006 Norme C22 2 No 3 Certi ed as an add on model February 2010 Floor May be installed on a well constructed combustible oor A noncombustible liner must be placed underneath the furnace at l...

Страница 7: ...must be off for normal operation DO NOT operate with loading door open ASH DOOR ALWAYS OPEN SLOWLY 1 ALWAYS switch furnace off before opening door DO NOT operate with ash removal door open 2 CLOSE and...

Страница 8: ...ndicates a potentially hazardous situation that if not avoided COULD result in death or serious injury if proper precautions are not taken CAUTION CAUTION Indicates a potentially hazardous situation t...

Страница 9: ...e furnace at least 16 406 mm in front and 8 203 mm on either side of the fuel loading and ash removel doors underneath the chimney connector and extending at least 2 50 mm on either side of the chimne...

Страница 10: ...nd Operation Manual 2011 Identifying Main Components see list of components on page 9 13 1 3 4 2 5 6 7 8 9 10 11 12 17 16 15 14 42 43 38 39 37 36 10 35 41 40 20 13 19 18 30 31 32 33 34 22 27 28 29 26...

Страница 11: ...Pump Plug Optional Low water cut off switch kit Ask your dealer for details Minimum Clearance to Combustibles Side Wall to Furnace 12 305 mm Back Wall to Furnace 12 305 mm Front of Furnace to Combusti...

Страница 12: ...instructions to re install the switch trigger remove the control front plate to view the inside of the control box guide the switch trigger into the 2 slots next to the limit switches 3 Remove the si...

Страница 13: ...and therefore no additional make up air is required 5 For a confined space or an unconfined space in a building with unusually tight construction an addition al source of make up air is required Plea...

Страница 14: ...nufacturing warranty covers the Pristine furnace only and does not include anything outside of the Pristine furnace Northland Distributing and Manufacturing takes NO responsibility for installations T...

Страница 15: ...parately from the furnace 7 The existing thermostat should be set several degrees lower than the new thermostat This will allow the regular system to cut in should the Pristine run out of wood and the...

Страница 16: ...m loop and side arm as low as possible PUMP BALL VALVE THERMOMETER BOILER DRAIN TEMPERING OR MIXING VALVE SYMBOLS INDEX Have a qualified electrician check to ensure changes or modifications are made i...

Страница 17: ...ace runs out of wood Figure 3 Note The existing furnace functions as a standby The aquastat on the standby furnace should be turned lower than the aquastat on the Pristine Auxiliary Heat Water to Wate...

Страница 18: ...From indoor furnace Figure 1 Figure 2 To furnace From furnace From pool or spa 110 white 110 black Immersion control Black wire 24 V lines POOL HEATER Bypass 24 V Transformer To pool or spa Common He...

Страница 19: ...shows 1 2 full shut the drain valve shut off water and disconnect the garden hose Note hot water level is higher than cold water level 7 Heatfurnacetooperatingtemperature see Starting the Fire below C...

Страница 20: ...nerally speaking when burning extremely dry firewood pieces should be over 5 12 7 cm in diameter If using high moisture wood use pieces that are less than 5 12 7 cm in diameter It is good to mix the d...

Страница 21: ...sh be too difficult to push through then first push the rod through without the brush 4 Inspect and clean any buildup in the exhaust area 5 Replace covers Secure rear access cover with screws 6 Open a...

Страница 22: ...t 2 Do not force the loading door open beyond the stop Power Outages The Pristine furnace unlike a gas or oil fired appliance does not stop generating heat when the power is interrupted even though th...

Страница 23: ...te a thin black coating in the firebox is acceptable but ensure that there is no ash in contact with bare metal 2 Check for damaged brick and replace as necessary Contact your dealer for replacement b...

Страница 24: ...owing messages will be shown Er Memory error Short circuit probe error Open probe error DTS Technical Data Accuracy 1 Output 16 Amp 1HP 240 Vac SPDT relay Supply voltage 115 Vac 10 Display 3 digit red...

Страница 25: ...Reference Pristine Series Installation and Operation Manual 2011 23 CAUTION DO NOT CONNECT THE ELECTRICAL COMPONENTS OF THIS UNIT TO ANY OTHER ELECTRICAL APPLIANCE...

Страница 26: ...x 36 cm Flue Collar Diameter 6 in 15 cm Log Length 24 in 61 cm Log Diameter 6 in 15 cm Furnace Weight 945 lb 429 kg Water Capacity 60 US Gal 227 L Features Model 1000 Electric Element Optional Wide A...

Страница 27: ...firebox floor The air then exits the firebox without causing the wood to burn Use seasoned wood Cut wetter pieces 8 inches 20 cm shorter than the firebox and load the logs centered in the firebox Spl...

Страница 28: ...more of the following a bad connection a faulty pump snap disc temperature is set too low valves are closed air is in the system or the water level is low Check for loose connections replace snap dis...

Страница 29: ......

Страница 30: ...en followed The Warranty Registration and a copy of the original bill invoice must be forwarded to Northland within thirty 30 days of the date of purchase to validate the warranty Issue Date June 2011...

Отзывы: