![Northern Lights NL-LATS200 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/northern-lights/nl-lats200/nl-lats200_assembly-instructions-manual_1708530005.webp)
-5-
12
K
M
J
D
J
I
Typical
G
Typical
F
Typical
E
E
J
J
START
1
FINISH
2
3
4
START
1
2
3
4
5
FINISH
6
Cables are a consumable and must
be treated as such. As a minimum,
an annual inspection must be
performed on all cable ends and full
lengths. A cable must be replaced
immediately if broken exposed
wires and/or a break in cable
coating are found.
AV
AU
5.
Start installation of the
Lat Top Cable
(AU) at the front
3-1/2" Pulley
(M) and
Lat Bar Hooks R&L
(10) using bolting and
Nylon Spacers 3/8" x 1/2"
(J) shown.
6.
Continue installing
Lat Top Cable
and
3-1/2" Pulleys
in order until all Pulleys have been installed.
Cable must be positioned on the pulley and then bolted in place using bolting and
Nylon Spacers
as
shown.
7.
Loosely bolt two
Floating Pulley Brackets
(11), one
3-1/2" Pulley
and
Lat Top Cable
together as
shown. After
Low Cable
(AV) has been installed, complete the connection with
Lat Top Cable
as shown
and tighten both bolts.
Typical
11