![Northern Lights Lugger M773LW3 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/northern-lights/lugger-m773lw3/lugger-m773lw3_operators-manual_1708505024.webp)
OM773LW3 11/20
22
Servicing
Updated 8-14-19
GENERATOR ENDS
The maintenance and operation recommendations for
the generator end are can be found in Owner’s Manual
OPX300K-2, included with your manual kit. Contact
your Authorized Northern Lights dealer or factory
representative for additional copies.
ELECTRICAL SYSTEM - GENERAL
1. Never switch battery switch off or break the circuit
between the alternator and batteries while the engine
is running. Regulator damage can result.
2. Do NOT reverse the polarity of battery cables when
installing the battery.
3. When welding near the unit, disconnect the AC and
DC voltage regulator and battery. Isolate the leads.
4. Disconnect the battery cables when servicing the D.C.
alternator.
5. Never test with a screwdriver, etc., against any
terminal to see if it emits sparks.
7. A D.C. circuit breaker protects your control panel
and wiring harness. It is located in the side of the
generator junction box.
GLOW PLUGS
1. Each cylinder is supplied with a glow plug which
serves to heat the combustion chamber for starting.
2. To check the glow plugs, measure the resistance
between terminal and engine block, using a high
quality meter. Resistance should be under 1 ohm.
3. Check all glow plugs and replace any that are faulty.
SP-14. HEAT EXCHANGER
1. Clean the heat exchanger core every 24 months, or
after 2500 hours of operation, or as needed.
2. Drain expansion tank and heat exchanger.
3. Remove heat exchanger end covers and remove core.
4. Clean the inside of exchanger core tubes using
a metal rod. Flush, inspect and clean again if
necessary.
5. Reassemble. Fill the cooling system, start the engine
and check for leaks.
SP-15. RAW WATER PUMP
1. Change the seawater pump impeller every 500 hours,
or as needed.
2. Remove the pump end cover. Pry out the impeller
using needle-nose pliers or two screwdrivers.
Be sure you remove all pieces of failed impeller.
NOTE: Place some kind of protection under the
screwdrivers in order not to damage the pump
housing.
3. Clean the inside of the housing.
4. Press in the new impeller and place the sealing
washers in the outer end of the impeller center if this
has not already been done.
5. Replace the cover using a new gasket.
NOTE: Make sure that there is always an extra
impeller and cover gasket in reserve on board.
SP-16. EXHAUST ELBOW
1. Visually inspect the exhaust elbow every 500 hours
of operation, or sooner if needed. If any rust or other
damage is noted, replace the elbow.
Figure 17:
Timing Mark
Содержание Lugger M773LW3
Страница 1: ...OPERATOR S MANUAL OPERATOR S MANUAL OM773LW3 For Model M773LW3 and M773LW3G www northern lights com...
Страница 11: ...OM773LW3 11 20 9 Notes...
Страница 31: ...OM773LW3 11 20 29 Troubleshooting Notes...
Страница 37: ...OM773LW3 11 20 35 DC Wiring Diagrams Updated 10 8 20 DC Wiring Diagram M773LW 12 VDC Isolated Ground B 10835D...
Страница 45: ...OM773LW3 11 20 43 Panel Wiring Diagram S 1 Panel B Deutsch A 12798B Updated 8 22 19 Panel Wiring Diagrams...
Страница 46: ...OM773LW3 11 20 44 Panel Wiring Diagrams Panel Wiring Diagram S 1B Panel B A 12791C Updated 8 22 19...
Страница 57: ......