
19
Assembly
1/2” QC HB Elbow
Qty 1
787213
Step 7 – Pump Assembly
•
Remove shipping plugs from pump ports.
•
Insert regulator assembly into
Outlet
port of pump and slide
red QC clip closed.
•
Insert hose barb fitting into
Inlet
port of pump and slide red
QC clip closed.
NOTE:
To insert quick connect fittings, lubricate O-ring
with water and twist fitting while inserting into pump port.
Tools Needed
•
N/A
Fasteners Needed from Owner’s Manual Bag: