13
Assembly
Step 2a – Tow Bar Assembly
•
Align tow bar assembly with cart assembly as shown below.
•
Insert bolts and secure with nuts. Torque to 20 Ft.-Lbs.
Tools Needed
•
1/2” wrench
•
Torque wrench
Fasteners Needed from Owner’s Manual Bag:
5/16” x 2” Bolt
Qty 2
82018
5/16” Nut
Qty 2
82019