North Star 10000 BDG Скачать руководство пользователя страница 9

8

GROUNDING - 

All units must be grounded.  Drive

a 3/4” or 1” copper pipe or rod into the  ground  close  to
the generator.   The pipe/rod must  penetrate  moist
earth.  Connect an approved ground clamp to the pipe.
Run a 10 gauge wire from the clamp to the generator
ground screw.  Do not  connect  to a  water  pipe or  a
ground used by a radio system.

OPERATING SPEED

The generator must be run at  the  correct  speed  in

order to produce the proper  electrical  voltage and
frequency.

The output voltage should be  checked  to ensure

the generator is working properly subsequent  to
connecting a load to the generator.  Failure to do so
could result in damage to equipment plugged into the
unit and possible injury to the individual.

All engines have a tendency to  slow down  when  a

load is applied.  When the electrical load is  connected
to the generator,  the engine is  more  heavily loaded,
and as a result the speed  drops  slightly.   This  slight
decrease in speed, together with the  voltage  drop
within the generator itself, results in a slightly lower
voltage when the generator is loaded to its full capacity
than when it is running with no  load.   The  slight
variation has  no  appreciable effect in the  operation of
motors, lights and most appliances. Electronic
equipment and clocks will be effected if correct RPM is
not maintained. See Load vs. Output chart

Load

Output

Percent of
Generator

Output

Speed
(RPM)

Frequency

(Hz)

Generator

voltage at 120V

Receptacle

0 %

3780

63.0

125V

50 %

3600

60.0

122V

100 %

3480

58.0

118V

Output voltage should be  checked  periodically  to

ensure continued proper  operation of  the  generating
plant and appliances, it can be checked with a portable
meter.  Frequency can be checked by using an electric
clock with a sweep second hand.  Timed against  a
wrist watch or a stop watch the clock should be correct
/- 2 seconds per minute.    All  speed  setting
adjustments  should  be done by  a qualified technician.

         GENERATOR  CARE

The generator head is a  two  pole, 3600  RPM,   60

Hz, brushless, revolving field and  synchronous  type
with two sealed radial roller bearings.

Proper care  and  maintenance are necessary  to

ensure a long trouble free life.

Exercising The Generator -

 

The generator

should be operated every four weeks.

. This  is

accomplished by starting the engine and applying a
load for 10 to 15 minutes.  This will dry  out  any
moisture  that has  accumulated in the  windings.    If  left,

this moisture can cause corrosion in the winding.
Frequent operation of the generator will also ensure
that  the  set is  operating properly  should it be needed
in an  emergency.

Generator Maintenance 

- The  generator head  is

brushless and maintenance free.  Any major  generator
service including the installation  or  replacement of
parts should be performed only by a qualified electrical
service technician.  USE ONLY NorthStar APPROVED
REPAIR PARTS AVAILABLE AT 1-800-270-0810.

A. Bearing - The bearings used in  this  generator

are a heavy duty,  sealed ball  bearing  type. They
require no maintenance or  lubrication.

B. Receptacles - Quality receptacles  have  been

utilized.  If a receptacle should become cracked or
otherwise damaged, replace it.  Using cracked or
damaged receptacles can be both dangerous to the
operator and destructive to the equipment.

 

WARNING, Stand-by  Operation

If your generator is to  be  used as  a  standby

electric power source in case of utility  failure, it must
be installed by a registered and licensed  electrician
and in compliance with  all applicable  state  and  local
electrical codes.  Also, local Fire Departments must  be
consulted concerning proper and safe handling
procedures for gasoline. 

NEVER

 connect  any

generator to any existing  electrical system without an
isolating, UL approved transfer switch, installed by a
licensed electrician.

Содержание 10000 BDG

Страница 1: ...00 BDG ITEM 165928 Belt Driven Generator M165928A OWNER S MANUAL 10000 BDG Any Questions Comments or Problems Call Customer Service at 1 800 270 0810 Hours Monday Friday 7 30 AM to 5 30 PM Saturday 7...

Страница 2: ...n Generator IMPORTANT If this machine is used by anyone who is not the owner or is loaned or rented make certain the operator Is instructed in the safe and proper operation of this machine Reads and u...

Страница 3: ...e Speed 3480 3780 RPM 120V Receptacle 2 20 Amp A duplex NEMA 5 20R 30 Amp A twistlock NEMA L5 30R 120 240V Receptacle 50 Amp A Straight blade NEMA 14 50R Circuit Breaker 2 20 Amp A thermal push to res...

Страница 4: ...Circuit Breakers 7 120 240V 50A Receptacle 2 30A Circuit Breaker 8 28 mm shaft 3 20A Circuit Breakers 9 Grounding screw 4 Voltmeter 10 Mounting feet 5 120V 20A Duplex Receptacles 11 Fan vents 6 120V...

Страница 5: ...o mount your generator thoroughly study the instructions and cautions in this manual to assure you are fully acquainted with the operation of all components of this generator Proper preparation operat...

Страница 6: ...t sand lint or abrasive materials can cause damage to the generator head and engine if allowed into the cooling system POWER TRANSMISSION The recommended method to transfer the power from the engine t...

Страница 7: ...he wattage listed on the equipment nameplate is its rated output However some equipment may require three to ten times more wattage than its rating on the nameplate as the wattage is influenced by the...

Страница 8: ...2000 15 CAUTION Equipment damage can result from the low voltage caused by using an extension cord with a small wire size Use this chart to estimate the total load on your generator For Determining Ge...

Страница 9: ...a stop watch the clock should be correct within 2 seconds per minute All speed setting adjustments should be done by a qualified technician GENERATOR CARE The generator head is a two pole 3600 RPM 60...

Страница 10: ...erator overheating a Generator is overloaded b Insufficient ventilation a Reduce the load See Load Application section of this manual b Make sure there is at least 3 feet of clearance on all sides of...

Отзывы: