![North Ridge Pumps seepex BN Series Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/north-ridge-pumps/seepex-bn-series/seepex-bn-series_operating-and-maintenance-instructions-manual_1707791026.webp)
Operating Instructions
Progressive Cavity Pump
Pin Joint Assembly
Dokument
document
Blatt
sheet
Datum
date
OM.PJT.02e
3 (3)
B / 27.01.97
For rotors made of hardened materials such as tool
steel (AISI D6), 1.2842, secure 2 x 180° offset
indents with tool/centre punch (WK)
- For rotors made of synthetic material, secure
using set screw (426). During this process,
point of set screw presses into the synthetic
surface (X). Set screw (426) is medium strengh
secured by screw locking device /adhesive.
•
Universal joint sleeve (405)
Remove air from interior of joint with tool/screw
driver (WS).
•
Holding bands re-assembly
Mount holding bands (406 and 407) using tool
(W3/see Point 9) as described in document
OM.HBD.01e.