Page 35 of 48
Message Center Description and operation
38
Power supply installation
QSY22
The Message Waiting power supply is installed according to the steps defined
in
. The QSY22 Message Waiting power supply supersedes the
QSY19 and can be mounted in any of the following cabinets:
— QCA8
— QCA23
— QCA28
— QCA37
The unit is mounted between the uprights immediately below the TBC
(
Figure 1
). To facilitate the installation of the Message Waiting power
supply, you may have to move the TBC up. If you have to move the TBC do
it before you start the steps of
.
Note:
The QSY22 includes the cables required for the –48 and –150 V
power leads. The cabinet wiring harness may or may not contain a P14
plug, depending on whether or not PE is provided in the cabinet.