Nortek P5RF-A Скачать руководство пользователя страница 5

5

aiR conditionER inStallation

unpacking the unit

It is recommended that the unit be unpacked at the 

installation site to minimize damage due to handling.

 caution:

do not tip the unit on its side. oil may enter the 

compressor cylinders and cause starting trouble. 

if unit has been set on its side, restore to upright 

position and do not run for several hours. then 

run unit for a few seconds. do this three or four 

times with five minutes between runs.

1. Remove the bands from around the unit.

2. Unfold the top and bottom cap flanges.

3. Carefully remove the top cap and tube.

installing Return & Supply air collars

If the supply and return collars are supplied with the unit, 

they will be located in the supply duct. They can be easily 

positioned over the unit openings (Figure 3) and secured 

with sheet metal screws.

•  The diameter of the return duct collar is 14”.

•  The diameter of the supply duct collar is 12”.

•  Before  permanently  installing  the  collars,  it  is 

recommended you pre-fit them over the openings first 

to determine best fit and alignment.

Supply Duct

1. Position the supply duct collar so the edge of the unit 

opening fits between the flange and the bead.

2. Overlap the collar ends keeping the small screw holes 

underneath.

3. Align the holes in the crimped area and install one screw. 

notE: 

It may be necessary to loosen the four screws 

that hold the transition duct in order to install the supply 

fitting. Re-tighten when installation is complete.

4. Tap collar (if necessary) to ensure engagement with 

unit opening and install second screw.

5. Tighten first screw and rotate collar clockwise so joint 

is near three o’clock position.

Figure 3. Return & Supply air collars

Transition

Duct Screws

Supply Air

Return Air

Duct

Dimples

MultiPlE duct aPPlication

SinglE duct aPPlication

Figure 2. Single & Multiple duct applications

Return Duct

1. Assemble the collar by overlapping the two ends.  

notE: 

One end of the collar is slotted and the opposite 

end has two small holes. Position the end with small 

screw holes underneath the slotted end.

2. Fasten the collar ends with two self drilling sheet metal 

screws.

3. Position the collar over the unit opening. Align the 

four holes in the collar with the four dimples or holes 

(depending on unit model) in the panel.

4. Secure the collar to the rear panel using self drilling 

screws (10-16x.5).

locating & installing the Return air assembly

To simplify installation, locate and install the return air 

assembly first. If desired, the return opening can be 

located inside a closet with louvered doors that has an 

open area equal to or greater than a 12” x 20” grille. The 

return air grille can be placed in the wall of a closet and 

the air ducted into the filter box through a boxed-in area at 

the closet floor level. Verify the filter is readily accessible.

Содержание P5RF-A

Страница 1: ...se plays an important role as well Pay attention to all safety warnings and any other special notes highlighted in the manual Improper installation of the furnace or failure to follow safety warnings...

Страница 2: ...Stage Heating 8 Cooling Mode 9 Electric Heat Package optional 9 Blower Speed 9 Outdoor Motor 4 5 Ton 9 Startup Adjustments 10 Pre Start Checklist 10 Start Up Procedure 10 Air Circulation 10 System Coo...

Страница 3: ...ant will damage the unit WARNING The information listed below must be followed during the installation service and operation of this unit Unqualified individuals should not attempt to interpret these...

Страница 4: ...ld be avoided The hot condenser air must be discharged up and away from the home and if possible in a direction with the prevailing wind Do not place the unit in a confined space Consideration should...

Страница 5: ...y be necessary to loosen the four screws that hold the transition duct in order to install the supply fitting Re tighten when installation is complete 4 Tap collar if necessary to ensure engagement wi...

Страница 6: ...rical conductors and circuit protection must be in compliance with information listed on the unit data label Any other wiring methods must be acceptable to authority having jurisdiction Provide power...

Страница 7: ...an uninterrupted or unbrokenelectricalgroundtominimizepersonal injury if an electrical fault should occur Do not use gas piping as an electrical ground Thisunitmustbeelectricallygroundedinaccordancew...

Страница 8: ...e use of a 2 stage Heat Cool thermostat should be used with this unit The heat cool thermostat prevents simultaneous operationoftheheatingandcoolingunitsandisequipped withanON AUTOfanmodethatallowsthe...

Страница 9: ...ntrols high speed cooling and heating operations and the orange wire controls the electric heating operation CAUTION To avoid personal injury or property damage make certain that the motor leads canno...

Страница 10: ...teps 1 3 until the system is correctly charged START UP ADJUSTMENTS Pre Start Checklist The following check list should be observed prior to starting the unit Verify the unit is level and allows prope...

Страница 11: ...on this equipment requires certain mechanical skills and tools If you do not possess these skills contact your dealer for maintenance Consult your localdealerabouttheavailabilityofmaintenancecontracts...

Страница 12: ...PT Drain Connection 1 12 13 1 38 3 2 3 2 5 29 A 3 Opening for 12 Diameter Supply Duct 9 15 17 50 9 0 Opening for 14 Diameter Return Duct 10 15 5 5 B 1 3 15 Rear View Side View Figure 7 Unit Dimensions...

Страница 13: ...uid Temperature F X24KA Charging Chart Cooling Add refrigerant when below curve Remove refrigerant when above curve Figure 9 Charging Chart for 3 ton Units 200 220 240 260 280 300 320 340 360 380 400...

Страница 14: ...g Liquid Temperature F X48KA Charging Chart Cooling Add refrigerant when below curve Remove refrigerant when above curve Figure 11 Charging Chart for 5 ton Units 200 220 240 260 280 300 320 340 360 38...

Страница 15: ...onducteurs en cuivre 3 Ne convient pas aux installations de plus de 150 V a la terre 7112720 FIELD WIRING LEGEND LOW VOLTAGE HIGH VOLTAGE WIRING DIAGRAM Packaged Air Conditioner Single Phase NOTES 1 D...

Страница 16: ...e 150 V a la terre FIELD WIRING LEGEND LOW VOLTAGE HIGH VOLTAGE WIRING DIAGRAM Packaged Air Conditioner Single Phase NOTES 1 Disconnect all power before servicing 2 For supply connections use copper c...

Страница 17: ...17...

Страница 18: ...18...

Страница 19: ...19...

Страница 20: ...________________ VOLTS L1 L2 Volts ______________________________________ VOLTS Hasthethermostatbeencalibrated YES NO Is the thermostat level YES NO Istheheatanticipatorsettingcorrect If Applicable YE...

Отзывы: